--- title: Johns Creek Zoning Ordinance, 12A.3.8.3. Measures and Requirements collection: local-codes id: local-code:johns-creek/zoning/12a.3.8.3 cite_as: Johns Creek, Ga., Zoning Ordinance § 12A.3.8.3 canonical_url: https://georgiacommons.org/code/local/johns-creek/zoning/12a.3.8.3 md_url: https://georgiacommons.org/code/local/johns-creek/zoning/12a.3.8.3.md text_url: https://georgiacommons.org/code/local/johns-creek/zoning/12a.3.8.3/text source_url: https://library.municode.com/ga/johns_creek/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:johns-creek jurisdiction_name: Johns Creek place_fips: "1342425" corpus_version: local-codes-johns-creek-d82a33babc69 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/johns-creek/zoning/~appendix-a/~article-xi.md previous: https://georgiacommons.org/code/local/johns-creek/zoning/12a.3.8.2.md next: https://georgiacommons.org/code/local/johns-creek/zoning/12a.3.10.2.md index: https://georgiacommons.org/code/local/johns-creek.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:johns-creek/zoning/12a.3.8.3@2026-11-11-1b5be9abb6 --- # Johns Creek Zoning Ordinance, 12A.3.8.3. Measures and Requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article XI - COMMUNITY/NEIGHBORHOOD/MOBILE HOME DISTRICTS A. Certified LEED Green Buildings Measure (3 to 5 points). 1. Minimum Requirement. Certify a new construction building or building undergoing major renovations through a green building rating system, such as the LEED certification system created by the United States Green Building Council (USGBC), requiring review by an independent, third-party certifying body and approved by the Community Development Director. Points shall be awarded as follows: a. Silver by a USGBC green program or equivalent: 3 points. b. Gold by a USGBC green program or equivalent: 4 points. c. Platinum by a USGBC green program or equivalent: 5 points. The score may include measures otherwise allowed by this section, however, no measure included as part of a certified green building may also be awarded points as a stand-alone measure. When a green building rating system equivalent to a USGBC green program is utilized, the applicant shall submit third-party documentation demonstrating how the measure is equivalent to the indicated LEED certification level. 2. Documentation. Required documentation includes registration of the project with the system, payment of all applicable fees for the rating system, and a draft scorecard showing the achieved credits or points. B. Green Roof Measure (3 points). 1. Minimum Requirements. Install a vegetated roof for at least 50% of the total new building roof area. 2. Documentation. Required documentation includes roof construction plans with drainage and planting details. C. Building Energy Efficiency Measure (2 points). 1. Minimum Requirements. a. New Construction Buildings. Newly constructed buildings must demonstrate an average 10% improvement over the 2015 International Energy Conservation Code, in Total Building Performance (§C407), or 20% in Building Thermal Envelope requirements (§C402). b. Major Renovation. The building must demonstrate an average 5% improvement over the 2015 International Energy Conservation Code, in Total Building Performance (§C407), or 10% in Building Thermal Envelope requirements (§C402), as amended by the State of Georgia. 2. Documentation. Required documentation includes an energy model demonstrating that the building(s) will achieve the proposed improvements. D. Building Water Efficiency Measure (2 points). 1. Minimum Requirements. Indoor water use in new buildings and major renovations must be an average 15% less than in baseline buildings. Baseline water usage shall be determined based on eco-friendly plumbing fixtures, rainwater reclamation programs, dual plumbing waste system to irrigate exterior landscapes with greywater and collected rainwater, and alternative programs by the United States Department of Energy or similar methods approved by the Community Development Director. 2. Documentation. Required documentation includes cut sheets for all water fixtures. E. Renewable Energy Sources Measure (3 points). 1. Minimum Requirements. Incorporate renewable energy generation on-site with a production capacity of at least 5% of the building's annual electric and thermal energy, established through an accepted building energy performance simulation tool. 2. The following renewable energy generation sources are applicable: a. Solar thermal or photovoltaics. b. Geothermal. c. Wind energy conversion. d. Anaerobic digestion. e. Other means of generating electricity without using a fuel, such as kinetic, heat exchange, approved by the Community Development Director. 3. Documentation. Required documentation includes specifications and construction details for the system installation. F. Bioretention (2 points). 1. Minimum Requirement. a. Provide landscaped bioretention areas in the interior of the parking lots, in streetscape planters, and on-street parking landscaping that meets the minimum 1" runoff reduction standard; b. Incorporate inwardly draining swales without curbs, or with adequate curb cuts, in lieu of raised planting areas surrounded by curbs; c. Landscape bioretention areas with species tolerant to frequent inundation; d. Provided wheel stops adjacent to parking and flush or permeable curbing adjacent to driving areas. 2. Documentation. Required documentation includes plans and detail specifications of planting areas and a hydraulic study demonstrating infiltration capacity. G. Heat Island Reduction Measure (2 points). 1. Minimum Requirements. Use any combination of the following strategies for 35% of all on-site, non-roof hardscape areas, including sidewalks, plazas, courtyards, parking lots, parking structures, and driveways. a. Tree Canopy Cover. Coverage of the surface at canopy tree maturity in 15 years. b. Solar reflective paving and roofing with a SRI (solar reflectance index) of at least 29. 2. Documentation. Required documentation includes plans and specifications for installation of the strategy. H. Pervious Pavement Measure (2 points). 1. Minimum Requirements. Install an open grid or pervious pavement system that is at least 40% pervious on 80% of all hardscape surface areas, including sidewalks, plazas, courtyards, parking lots, and driveways. 2. Documentation. Required documentation includes plans and specifications for installation. I. Connected Open Space (2 points). 1. Minimum Requirements. Provision of all of the following: a. All required open space within an interconnected network with no width dimension less than 40 feet; b. Required open spaces may extend across public and private streets and multi-use trails, but street area may not be counted towards open space; c. All required open space provided at ground level; d. Minimum size of 2 acres, excluding any consolidated open space in "J" below. 2. Documentation. Required documentation includes plans showing open spaces. J. Consolidated Open Space (3 points). 1. Minimum Requirements. Provision of all of the following: a. All required open space in a one contiguous area with no width dimension of less than 100 feet; b. Required open spaces may not extend across public or private streets; c. All required open space provided at ground level; d. Minimum size of 2 acres. 2. Documentation. Required documentation includes plans showing open spaces. K. Sustainable Landscaping Measure (1 point). Conform to both of the following minimum requirements: 1. Minimum Requirement 1. Reduce potable water used for landscape irrigation by 50% from a calculated midsummer baseline case by using either one of the following methods: a. Utilizing all xeriscape plant materials and providing no permanent irrigation system; b. Using only captured rainwater with an irrigation system. 2. Minimum Requirement 2. Exclusion of any plant species listed on the Georgia Exotic Pest Plant Council Invasive Species List from project planting plans. 3. Documentation. Required documentation includes a landscape plan, irrigation plan, a list of proposed species, and an affidavit from a certified Landscape Architect that no species identified in subsection 2 immediately above will be planted. L. Additional Landscaped Civic Space Measure (1 to 5 points). 1. Minimum Requirement. Provision of additional landscaped civic space or a multi-use trail over the amount required by this overlay or the underlying district, whichever is greater. Additional civic space must be landscaped with lawns, ground cover, shrubs, or woodlands and may not be paved or otherwise impervious except for paths and trails. One point shall be available for each one additional percent of gross acreage provided as civic space, up to five total points for this measure. 2. Documentation. Required documentation includes site and/or building plans locating the additional open space. M. Transportation Demand Management (2 to 3 points). 1. Minimum Requirement. Provision of three of the following shall be awarded two points and provision of four or more of the following shall be awarded three points: a. Flex-time work schedules by employers to reduce congestion at peak times. b. Provision of building or project bicycle rentals for use by any occupant. c. Free ride home in case of emergency or sickness for employees using transit. d. Provision of transit passes to building occupants for a period of 2 or more years. e. Other tools that encourage transit and bicycle use, or reduce personal vehicular traffic may be approved by the Community Development Director. 2. Documentation. Required documentation includes a written narrative of the tools to be provided and any other documentation required by the Community Development Director. N. Enhanced Bicycle Amenities Measure (1 to 2 points). 1. Minimum Requirements. Provision of two of the following shall be awarded one point and provision of three or more of the following shall be awarded two points: a. Lockable enclosed bicycle storage. Provide one secure, enclosed bicycle storage space per 25 employees. b. For office or commercial space, employee shower facilities. Provide a minimum of one shower facility plus one additional shower per 150 employees. c. Repair Center. Provide a designated bicycle repair center open to the public and consisting of an air pump, water, and tools at a minimum. d. Bicycle parking spaces. Provide at least 200% of the bicycle parking requirements of Section 12A.3.4.3. e. Bicycle paths. f. Bicycle rental stations. 2. Documentation. Required documentation includes site and/or building plans locating the measures included. O. Alternative Transportation Measure (1 point). 1. Minimum requirement. Provisions of the following: a. Ride-Sharing. Provide at least one on- or off-street pickup/drop-off zone per 100 new or added vehicular parking spaces for the exclusive use of passengers arriving by taxi, ridesharing, or shuttle. No project using this measure shall have less than one such space. b. Van Pools. Provide at least one van pool space per 200 new or added vehicular parking spaces. P. Alternative Measure (1 to 3 points). The applicant may submit an alternative EcoMeasurement for review and recommendation by the Community Development Director. 1. Minimum Requirements. The measure must be unrelated to any of the other measures defined in this Section. Based upon their review, the Community Development Director must determine for the number of points to be awarded. 2. Documentation. Required documentation must clearly illustrate that the project will achieve the measure. 12A.3.9. Building Type. Within the Town Center Overlay, building types are used to regulate the design of buildings, and a building's type is determined by the Community Development Director. Within the Town Center Zoning District, building types are subject to the additional requirements of the applicable zoning district. Note that these building types are for zoning purposes only, and not linked to the Building Code. Freestanding parking structures are not considered to be a building type. 12A.3.9.1. Detached House. A building type that accommodates one dwelling unit on an individual lot with yards on all sides. Not intended for non-residential uses. Lot Detached house units per lot 1 max. Pedestrian Access Access to street Required Walkway width 3 ft min./5 ft max. 12A.3.9.2. Cottage Court. A building type designed to accommodate 5 to 10 detached dwelling units organized around a shared internal courtyard. Units cannot be vertically mixed. Site Site width/depth 150 ft min. Cottage court units per site 5 min./10 max. Courtyard Area 400 sq. ft./unit Width 40 ft min. Courtyard may not be parked or driven upon, except for emergency access and permitted temporary events. Pedestrian Access Access to street Required for units along street Walkway width 3 ft min./5 ft max. Vehicular Access Alley Loaded 12A.3.9.3. Duplex. A building type that accommodates two dwelling units arranged either horizontally or vertically. Not intended for non-residential uses. Lot Duplex units per lot 2 max. Pedestrian Access Access to street Required Walkway width 3 ft min./5 ft max. 12A.3.9.4. Townhouse. A building type that accommodates 3 or more dwelling units where each unit is separated by a common side wall. Units cannot be vertically mixed. Site Townhouse units row 3 min./8 max. Fenestration (Unit) Ground floor 15% min. Upper story 15% min. Blank wall area 20 ft max. in width per story End units 20% minimum Pedestrian Access Access to street Required for units along street Walkway width 3 ft min./5 ft max. Parking Location Rear load only. No on-site parking is allowed between the building and the street. Design No more than three adjacent units may have identical facade designs. Differentiation between adjacent units may be accomplished by a change in materials, building height, color, roof form, or setbacks. 12A.3.9.5. Walk-up Flat. A building type that accommodates 3 to 8 dwelling units vertically and horizontally integrated. Site Walk-up flat units per building 3 min./8 max. Fenestration Ground floor 20% min. Upper story 20% min. Blank wall area 20 ft max. in width per story Pedestrian Access Access to street Required for lobby (if provided) and ground floor units along street Walkway width 3 ft min./6 ft max. Parking Location No on-site parking is allowed between the building and the street. 12A.3.9.6. Stacked Flat. A building type that accommodates 9 or more dwelling units vertically and horizontally integrated. Site Stacked flat units per building 9 min. Street facing façade length 200 ft max. Fenestration Ground floor 20% min. Upper story 20% min. Blank wall area 20 ft max. in width per story Pedestrian Access Access to street Required for lobby and ground floor units along street Walkway width 3 ft min./8 ft max. Parking Location No on-site parking is allowed between the building and the street. 12A.3.9.7. Shopfront. A single-story building type that typically accommodates single-use retail or commercial activity. Site Street facing façade length 300 ft max. Height Ground floor height (floor to ceiling) 14 ft min. Fenestration Ground floor (facing arterial street, Creekside Pond or linear park / facing local street) 60% min. / 30% min. Blank wall area (facing arterial street, Creekside Pond or linear park / facing local street) 30 ft max. / 50 ft max. Pedestrian Access Access to street Required every 75 ft of frontage Walkway width 6 ft min. Parking Location No on-site parking is allowed between the building and the street. 12A.3.9.8. Mixed-Use Building. A multi-story building type that typically accommodates ground-story retail, office, or commercial uses with upper-story residential or office uses. Not for ground-story street-facing residential uses along arterial or collector streets. Site Street facing façade length 500 ft max. Height Ground floor height (floor to ceiling) 14 ft min., or 9 ft min if ground-level is residential Fenestration Ground floor (facing arterial street, Creekside Pond or linear park / facing local street) 60% min. / 30% min. Blank wall area (facing arterial street, Creekside Pond or linear park / facing local street) 30 ft max. / 50 ft max. Upper story 20% min. Pedestrian Access Access to street Required for every 75 ft of frontage Walkway width 6 ft min. Parking Location No on-site parking is allowed between the building and the street: 12A.3.9.9. General Building. A multi-story building type that typically accommodates non-residential uses such as industrial, hotel, or office uses on all stories. Site Street facing façade length 500 ft max. Height Ground floor height (floor to ceiling) 11 ft min. Fenestration Ground floor (facing arterial street, Creekside Pond or linear park / facing local street) 50% min. / 20% min. Blank wall area (facing arterial street, Creekside Pond or linear park / facing local street) 40 ft max. / 60 ft max. Upper story 20% min. Pedestrian Access Access to street Required for every 150 ft of frontage Walkway width 6 ft min. Parking Location No on-site parking is allowed between the building and the street. 12A.3.9.10. Civic Building. A building type that accommodates civic uses. Not intended for commercial, retail, office, or residential uses. Fenestration Ground floor 15% min. Blank wall area 60 ft max. Upper story 15% min. Pedestrian Access Access to street Required Walkway width 6 ft min. Parking Location No on-site parking is allowed between the building and the street. 12A.3.9.11. Live-Work Building. A mixed-use building type that consists of a commercial and residential use. Fenestration Ground floor 50% Upper story 15% min. Pedestrian Access Access to street Required Walkway width 6 ft min. Parking Location No on-site parking is allowed between the building and the street. 12A.3.10. Building Design. 12A.3.10.1. Applicability. This Section applies to all new buildings, additions to existing buildings, and any change to a building façade except for maintenance and repairs.