A. Required Districts: AG-1 and M-1 B. Standards: 1. No access shall be allowed from local streets. 2. Access streets shall be paved and shall be able to withstand maximum load limits established by the State of Georgia as approved by the Director of Public Works. 3. No portion of a new landfill shall be located within a three mile radius of the property lines of an existing landfill. 4. The waste disposal boundary of a landfill shall be located at least 500 feet from all property lines except adjacent to M-1 (Light Industrial) and zoned districts. 5. A minimum 200-foot buffer and 10-foot improvement setback shall be required along all property lines except public rights-of-way. 6. A minimum 50-foot buffer and 10-foot improvement setback shall be required along all public rights-of-way. 7. A minimum 6-foot high solid fence or wall shall be located on property lines or interior to the required buffers and improvement setbacks. 8. Limit hours of operation from 6:00 a.m. to 6 p.m., Monday through Saturday. 9. The owner shall provide the Director of the Community Development Department a current copy of all applicable permits from the Georgia Department of Natural Resources upon application for a Land Disturbance Permit. 10. Vehicles shall be allowed into a landfill site only if waste is covered to prevent blowing of material from the vehicle. 11. In accordance with Article 28.4.3.2., submit an Environmental Impact Report as required. 12. No portion of a new or expanded landfill shall be located within a one (1) mile radius of the property lines of residentially zoned or used property. An expanded landfill shall not include any expanded use within the parcel boundaries of an existing site or location. 13. The landfill shall be operated in accordance with the Rules of Georgia, Department of Natural Resources, Environmental Protection Division, Chapter 391-3-4 Solid Waste Management, Official Code of Georgia Annotated 12-8-20 Georgia Comprehensive Solid Waste Management Plan, and 40 CFR Part 258 (Subtitle D of RCRA).