A. Required Districts: C-2 and M-1A B. Standards: 1. Limit hours of operation from 7:00 a.m. to 8 p.m., Monday through Saturday. 2. No portion of a new recycling facility shall be located within a three mile radius of the property lines of an existing recycling facility. 3. A minimum 200 foot buffer and 10-foot improvement setback shall be required along all property lines except public rights-of-way. 4. A minimum 50-foot buffer and 10-foot improvement setback shall be required along all public rights-of-way. 5. All recyclable materials shall be stored in containers with no stockpiling outside the containers. 6. Collection, storage containers, or receptacles shall not be allowed in minimum yards. Storage shall be screened with a six-foot high, solid wall or fence, including access gates. 7. The processing of recyclable materials must be done within an enclosed building. 8. Driveways shall be designed so vehicles will exit the facility in a forward direction. 9. A maximum continuous sound level of 65 dBA and a maximum peak sound level of 75 dBA shall not be exceeded at property lines of adjacent residential districts and/or AG-1 districts used for single-family. 10. The recycling center shall comply with regulations administered by the Fulton County Department of Health. 11. In accordance withArticle 28.4.3.2., submit an Environmental Impact Report as required. 19.4.38. Open.