A. Required District: M-1 B. Standards: 1. No access shall be allowed from local streets. 2. Access streets shall be paved and shall be able to withstand maximum load limits established by the State of Georgia as approved by the Director of Public Works. 3. No portion of a new transfer station shall be located within a three mile radius of the property lines of an existing transfer station. 4. A minimum 200-foot buffer and 10-foot improvement setback shall be required along all property lines except public rights-of-way. 5. A minimum 50-foot buffer and 10-foot improvement setback shall be required along all public rights-of-way. 6. A minimum 6-foot high solid fence or wall shall be located on property lines or interior to the required buffers and improvement setbacks. 7. Limit hours of operation from 6:00 a.m. to 6 p.m., Monday through Saturday. 8. The owner shall provide the Director of the Community Development Department a current copy of all applicable permits from the State of Georgia upon application for a Land Disturbance Permit. 9. In accordance withArticle 28.4.3.2., submit an Environmental Impact Report as required. 10. No portion of a new or expanded solid waste transfer station shall be located within a one (1) mile radius of the property lines of a residentially zoned or used property. An expanded solid waste transfer station shall not include any expanded use within the parcel boundaries of an existing site or location. 11. Transfer stations shall be sited and operated in accordance with State Regulations 3891-3-4.06, Permit by Rule for Collection, Transportation, Processing, and Disposal, O.C.G.A. ยง 12-8-20 Georgia Comprehensive Solid Waste Management Act, Fulton County Solid Waste Management Plan, and Waste Transfer Stations: A Manual for Decision-Making (EPA R-02-002, June 2002).