--- title: Jonesboro Zoning Ordinance, Sec. 86-455. Standards for construction buffers collection: local-codes id: local-code:jonesboro/zoning/86-455 cite_as: Jonesboro, Ga., Zoning Ordinance § 86-455 canonical_url: https://georgiacommons.org/code/local/jonesboro/zoning/86-455 md_url: https://georgiacommons.org/code/local/jonesboro/zoning/86-455.md text_url: https://georgiacommons.org/code/local/jonesboro/zoning/86-455/text source_url: https://library.municode.com/ga/jonesboro/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:jonesboro jurisdiction_name: Jonesboro place_fips: "1342604" corpus_version: local-codes-jonesboro-6cd8fb5d1a19 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/jonesboro/zoning/~chapter-86/~article-xv.md previous: https://georgiacommons.org/code/local/jonesboro/zoning/86-454.md next: https://georgiacommons.org/code/local/jonesboro/zoning/86-456.md index: https://georgiacommons.org/code/local/jonesboro.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:jonesboro/zoning/86-455@2026-11-14-f2553417f1 --- # Jonesboro Zoning Ordinance, Sec. 86-455. Standards for construction buffers > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Chapter 86 - ZONING / Article XV - LANDSCAPING AND BUFFERS (a) [Generally.] Construction buffers shall only be required where specifically provided as a condition of zoning, special use or variance approval. (b) Time constraints. Construction buffers shall only be in effect during the construction period of a project and shall terminate upon project completion. In the case of a residential subdivision, a construction buffer shall terminate upon each individual lot with the issuance of a certificate of occupancy for the principal dwelling. (c) Disturbance or encroachments. (1) Construction buffers shall be natural, undisturbed and free of encroachments except as authorized by a condition of zoning, special use or variance approval, or as authorized herein. (2) The encroachment of ditches swales stormwater conveyance facilities, stormwater detention ponds, sediment basins, sanitary sewer conveyance facilities, similar facilities, and any associated easements, into a construction buffer shall not be authorized except that necessary access and utility crossings (e.g. storm water or sanitary sewer pipes) and natural bottom detention ponds (sediment basins must be located outside of the construction buffer) and their appurtenant structures which require no grading and removal of trees, may encroach upon the construction buffer. (3) If the construction buffer on a residential lot is devoid of existing trees and vegetation, and a tree survey is submitted to document this situation prior to conducting land disturbing activities (including clearing) on the lot, then the zoning administrator or his designee may authorize the encroachment of a building or structure into the construction buffer for a distance not to exceed ten feet. (d) Protection during land disturbing activities. (1) During authorized land disturbing activities construction buffers shall be clearly demarcated and protected prior to commencement of, and during, construction. (2) The method of demarcation and protection utilized shall be in accordance with best management practices or as required by the zoning administrator or his designee. ## History (Ord. No. 05-08, § 2(15.05), 8-15-2005; Ord. No. 2023-006, § 1(Exh. A), 7-10-2023)