Upon completion of the installation of the improvements required by this chapter, the sub-divider shall present to the Community Development office three complete sets of the construction plans and drawings showing the subdivision and its improvements. This set of plans and drawings shall include: 1. "As-built" plans of all streets and alleys showing the planned and actual location of all utility lines. 2. "As-built" centerline profiles of all streets. 3. Profiles and invert elevations of all storm and sanitary sewer lines as such improvements shall have actually been installed by the sub-divider. 4. A letter submitted by a registered professional engineer and/or registered surveyor certifying that all sewers, storm drains, curbing and paving have been placed according to grade stakes set by him or his representatives to conform with construction plans submitted to and approved by the city engineer.