5. Speculative grading may be postponed for up to six months provided that appropriate performance security arrangements are made in accordance with this Section. 6. Tree Density requirements for additions to existing projects may be met in one of the following ways: a. Calculate the area of any new land disturbance and/or improvements and add replacement trees based on that area (existing trees elsewhere on the site may not be counted with this option); or, b. Base density requirements on the total site area and count any existing trees on the site (subject to all restrictions noted elsewhere in these standards). 7. Phased projects. a. If a tract is to be developed in phases, a separate permit shall be required for each phase as appropriate. b. Density calculations must be based on a site area established for each phase line or construction limit line. Existing trees to be counted toward meeting the density requirements must be within the limits of the phase line. c. Time limit on approval. A permit shall be valid for 12 months. In the event the permittee has not begun the permitted work within 12 months, the permit shall lapse and a new permit must be obtained before work can begin. Once work is begun under a valid permit the permittee may continue the permitted work until the work is completed. Any permit, including grandfathered projects, will automatically lapse after 12 months of inactivity, unless the developer has obtained an extension from the director.