Skip to content
Georgia Commons
Menu

Kennesaw · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Chapter 4 - SITE DESIGN STANDARDS / Article 2 - REGULATING PLANS

2.3. Required Buffers

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

2.3.1 The requirements of Section 3.07 .04 of the Unified Development Code that refers to required buffer zones shall not apply within the boundaries of the Official Regulating Plan between different parcels when both parcels are located within the boundaries of such Plan.

2.3.2 Where a parcel located within the Official Regulating Plan is adjacent to a parcel outside of such Plan, there shall be a 20 foot mandatory planted buffer or an undisturbed natural buffer within the parcel located within the Official Regulating Plan, as may be determined by the Planning and Zoning Administrator in order provide maximum visual screening and sound buffer. This requirement shall not preclude utility easements as may be reasonably required or deemed necessary by the City or other public utility. Said 20 foot buffer may be located within the area designated as setback.

2.3.3 Unless otherwise varied Stream and waterway buffers must be provided as per

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:kennesaw/zoning/2.3@2026-11-11-6d650c3ed5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Kennesaw Zoning Ordinance, 2.3. Required Buffers | Georgia Commons