1. In situations where the tree conservation and replacement requirements cannot be met because a project site will not bear the required density of trees, a request for alternative compliance may be submitted to the Director. In no instance shall more than fifty (50) percent of the required site density factor be met through alternative compliance.

2. Parking Lot and Street Yard Requirements.

a. If sufficient cause is demonstrated that the parking lot and street yard planting requirements cannot be met, a request for alternative compliance which is equal to (or exceeds) the minimum requirements may be submitted to the Director.

b. Sufficient cause is deemed to be when enforcing any of the parking lot or street yard requirements would cause the applicant to violate any state or federal law or any City ordinance or zoning stipulation specific to the applicant.

c. A land disturbance permit will only be issued after the Director has approved and received the necessary documentation and funds if required.

3. Alternative compliance methods include the following.

a. Off-site Planting.

• The off-site location, if at all possible, should be in the same area of the city as the project site and shall be on public property.

• A tree replacement plan, meeting all applicable standards in these guidelines, must be reviewed and approved by the Director before any work is started.

• The following note must be shown on the approved plan: "A tree replacement plan addendum for this project shall be submitted to the Director at least thirty

(30) days prior to requesting a final inspection. This plan shall include the species, size and location of trees to be planted off-site to meet the tree density deficit shown. Release of this project is subject to approval of this plan as well as verification of the installation of the trees."

b. City Tree Bank Fund. The City will accept contributions to the tree bank fund which will be used for the sole purpose of planting trees and landscaping material on public property. The locations of plantings will be determined by the Director. Calculating contribution amounts are as follows:

1. Contribution calculations are based on a tree unit value of $400.00 each, representing material costs, labor, maintenance and guarantee for trees planted.

11. To determine the appropriate contribution, first calculate the tree density factor deficit (TFDl or unit value that cannot be planted-on site then multiply by $400.00 per tree.

m. Fund administration. The City Tree Bank fund will be administered by the City.

History

The history line the source prints at the end of the section.

(Ord. No. 2015-14, Att., 12-21-15)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:kennesaw/zoning/3.07.13@2026-11-11-b07ab176f3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Kennesaw Zoning Ordinance, 3.07.13. Alternative Compliance | Georgia Commons