Skip to content
Georgia Commons
Menu

Kennesaw · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE

6.00.02. Permits Required; Obstructions

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. No person, partnership, corporation, or their agents or employees or contractors shall remove, cut, dig into, tear up or make or cause to be made any opening or excavation in any public street, public road, public alley, public way, public ground, public sidewalk or City-owned easement or fill or alter any culvert or construct or install additions or extensions to its existing facilities within the City without a permit issued by the Public Works Director or his or her designee.

B. The applicant or applicant's contractor shall submit to the City a written request for a construction/street excavation permit and a plan of the proposed alteration, extension, or addition showing its location and details of construction, including specified depth, method of excavation, open cut or boring, provisions of restoration and whatever the City would deem necessary for review and consideration.

C. It shall be unlawful to place or maintain, or cause to be placed or maintained, in any of the streets or in any of the easements, or on any of the public sidewalks of the City, any obstruction of any kind or character whatever, except by the consent of the Mayor and Council or a designated officer of the City.

D. It shall be unlawful for any property owner, lessee or tenant to construct, establish, open, grade or cause to have constructed, or in any manner to form or use a driveway or other opening from private property into any street, highway or thoroughfare in the city or entered upon across any sidewalk in the city, without first obtaining a permit for such work from the mayor and council or designated city officer. When such permit is issued, the owner, lessee, tenant or other constructing party shall conform to all requirements of the standard specifications of the city in use at the time for that portion of the driveway from the curb or gutter line to the property line, and such constructing party shall conform to all grades established and other special requirements in effect at the time. In no event, however, shall any driveway be constructed in the city so as to prevent or obstruct the free flow or passage of water in the gutters of any streets in the city, or in any streets themselves having no gutters constructed thereon.

History

The history line the source prints at the end of the section.

(Ord. No. 2018-21, § l(Exh. A), 10-15-18)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:kennesaw/zoning/6.00.02@2026-11-11-5d73607d19

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Kennesaw Zoning Ordinance, 6.00.02. Permits Required; Obstructions | Georgia Commons