--- title: Kennesaw Zoning Ordinance, 6.11.07. Storm Water Detention Facilities collection: local-codes id: local-code:kennesaw/zoning/6.11.07 cite_as: Kennesaw, Ga., Zoning Ordinance ยง 6.11.07 canonical_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.07 md_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.07.md text_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.07/text source_url: https://library.municode.com/ga/kennesaw/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:kennesaw jurisdiction_name: Kennesaw place_fips: "1343192" corpus_version: local-codes-kennesaw-1e0c921092e2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/kennesaw/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.06.md next: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.08.md index: https://georgiacommons.org/code/local/kennesaw.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:kennesaw/zoning/6.11.07@2026-11-11-54057b7c9b --- # Kennesaw Zoning Ordinance, 6.11.07. Storm Water Detention Facilities > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE A. Each project shall provide stormwater controls such that predevelopment peak flow rates are maintained, unless otherwise approved by Division Manager of Stormwater Management or his/her designee B. Storms with a statistical rate ofreturn of two (2), five (5), ten (10), twenty-five (25), fifty (50), and one hundred (100) years shall be evaluated and controls created to attenuate peak flows. C. Responsibility for calibration and application of the empirical equations rests with the design engineer. D. Times of concentrations ofless than ten ( 10) minutes for existing/undeveloped conditions are not acceptable for design nor are runoff percentages CN's higher than fifty-five (55) for on-site area, without supporting documentation acceptable to the City of Kennesaw Stormwater Management Division. E. Hydrologic calculations must employ an engineering methodology currently recognized and accepted within the industry. This methodology must include a hydrograph routing analysis, which generates an inflow hydrograph to the detention pond to create an outflow hydrograph. Multiple inflow hydrographs shall be combined on a real time basis. Multiple outflow hydrographs shall be combined on a real time basis. Multiple detention ponds in series must be routed from one to the next and so on throughout. F. A hydrograph routing analysis shall be submitted for all proposed areas drainage structures, which intercept more than three hundred twenty (320) acres (one-half (1/~) square mile). G. Where existing developed sites are changed, only those portions of the site, which are unchanged, are "grandfathered" as existing conditions for allowable runoff calculations. That is, impervious areas will be grandfathered as "existing conditions" in only those areas that are not changed, modified, or improved and constitute less than forty percent (40%) of the total impervious area. The calculated allowable flow from all areas razed and reformed must be considered in the undeveloped condition. ## History (Ord. No. 2012-03, 5-7-12)