--- title: Kennesaw Zoning Ordinance, 6.11.08. Stormwater Hydrologic Methodology collection: local-codes id: local-code:kennesaw/zoning/6.11.08 cite_as: Kennesaw, Ga., Zoning Ordinance ยง 6.11.08 canonical_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.08 md_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.08.md text_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.08/text source_url: https://library.municode.com/ga/kennesaw/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:kennesaw jurisdiction_name: Kennesaw place_fips: "1343192" corpus_version: local-codes-kennesaw-1e0c921092e2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/kennesaw/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.07.md next: https://georgiacommons.org/code/local/kennesaw/zoning/6.11.09.md index: https://georgiacommons.org/code/local/kennesaw.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:kennesaw/zoning/6.11.08@2026-11-11-738ca1d248 --- # Kennesaw Zoning Ordinance, 6.11.08. Stormwater Hydrologic Methodology > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE A. The design professional engineer may utilize any industry-accepted methodology for creating hydrologic design which routes a hydro logic model of the storm through the detention pond and outlet control structure and generates a related hydrologic model for output. All storms from two (2) year to the one hundred (100) year event shall be analyzed and controlled such that corresponding peak flows leaving the site are not increased. B. To expedite City of Kennesaw's review, the hydrologic study for the project must include the listing of input parameters: 1. Drainage areas in acres; 2. Time of concentration/lag time; 3. Amount or percentage of impervious area within the drainage area both before and after the project; 4. Length, in feet, of all drainage system improvements along the route; and, 5. Soil Conservation Services (SCS) curve numbers estimates for before and after project conditions. C. Analysis of stream flow and backwater elevations shall be consistent with FEMA's accepted methodologies whether or not the project is within a Federal Emergency Management Agency (FEMA) Flood Zone. The U.S. Army Corps of Engineers' standard step HEC II analysis, HEC RAS or approved equal shall be utilized. Routing of flood waters through an impoundment using a hydrologic model (to justify attenuated peak flows, for example) may be allowed, subject to approval of the Public Works Director or his or her designee (Ord. No. 2012-03, 5-7-12)