All permanent easements shall be: A. A minimum of ten feet (10') for piped easements; B. A minimum of twenty feet (20') wide for open channel; C. Defined as ten feet ( 10') on each side of the centerline of drainage course; D. Wide enough to allow for full depth excavation of pipe within the side slope limitations of the Trench Ordinance. Nominally, this requires the drainage easement to be four (4) times the depth of the pipe. As an alternative for consideration, engineers can submit concrete pipe designs.