--- title: Kennesaw Zoning Ordinance, 6.15.05. General Criteria collection: local-codes id: local-code:kennesaw/zoning/6.15.05 cite_as: Kennesaw, Ga., Zoning Ordinance ยง 6.15.05 canonical_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.15.05 md_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.15.05.md text_url: https://georgiacommons.org/code/local/kennesaw/zoning/6.15.05/text source_url: https://library.municode.com/ga/kennesaw/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:kennesaw jurisdiction_name: Kennesaw place_fips: "1343192" corpus_version: local-codes-kennesaw-1e0c921092e2 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/kennesaw/zoning/~appendix-a.md previous: https://georgiacommons.org/code/local/kennesaw/zoning/6.15.04.md next: https://georgiacommons.org/code/local/kennesaw/zoning/6.15.06.md index: https://georgiacommons.org/code/local/kennesaw.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:kennesaw/zoning/6.15.05@2026-11-11-474aecfc06 --- # Kennesaw Zoning Ordinance, 6.15.05. General Criteria > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE Design to be by registered civil engineer licensed to practice in the State of Georgia. Detention pond dams equal to or greater than 15 feet in height or greater than 50 acre feet of storage must conform to the corresponding design criteria for permanent impoundments, as referenced above. Smaller detention pond, refer to Storm Water Management section for guidance. The following criteria apply to dry detention pond dams less than 15 feet high and less than 50 acre feet: 1. Design storm shall be at least the 100-year storm. 2. Multi-frequency outflow control shall be provided for the 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year frequency storms per the current City of Kennesaw Storm Water Management Ordinance. 3. Principal spillway shall be adequate to handle at least the 25-year flood. 4. Emergency spillway(s) shall be provided to handle flows in excess of the 25-year flood, up to the 100-year flood. 5. No orifice shall be less than 3 inches in diameter unless it is installed to meet a State or local requirement. 6. Install fencing around all ponds deeper than 6 feet as measured vertically from the crest of the dam down to the invert of the lowest control structure. Gates are to be at least 12-feet wide to permit access for maintenance equipment. The City is not responsible for the replacing of any non-permitted structures or plantings destroyed, removed, or otherwise damaged during maintenance operations. Fencing shall not be installed across spillways or drainage ways. 7. A 12-foot combined drainage and permanent access easement shall be established around the pond at the 100-year pool level or at the elevation of top of dam, whichever is greater to provide access and permanently prevent usage or modification of this flood storage area. A 12-foot combined easement shall also be provided along the toe of the dam. A 20-foot access easement from the public right-of-way shall be provided.