A. Responsibility for Costs. Each Utility shall be responsible for the cost of repairing any Facilities in the Rights-of-way and adjoining property or other Facilities which it or its Facilities damage. A Utility shall be obligated, at its own cost and expense, to replace, restore, or repair, any Street, Facilities, or property or structure thereon, thereunder, there over or adjacent thereto that may be disturbed or damaged as a result of the Construction or installation, operation, upgrade, repair or removal of Facilities. B. Condition. The Utility shall replace, restore, or repair to a condition as good as or better than its condition before the work performed by the Utility that caused such disturbance or damage. 1. The Utility is responsible for the proper backfilling and replacement of the surface of the Right-of-way. Any pavement settlement shall be immediately repaired at the expense of the Utility. 2. The Utility shall conduct any such restoration so as to not obstruct the free flow or passage of water in the gutters of any streets in the City. 3. The Utility performing the work under the Utility Permit shall be responsible for all defects in workmanship and shall be liable for all damages resulting from such defects. C. Reimbursement for Costs. If the Utility does not commence such replacement or repair after fifteen (15) business days following written notice by the Director, the City or the owner of the affected structure or property may make such replacement or repair and the Utility shall reimburse the actual cost of the same within thirty (30) calendar days of the City or the owner giving notice to the Utility of the actual cost. Such notice by the City or property owner may be accompanied with supporting documentation justifying the actual cost. D. Penalty. Any Utility neglecting, refusing, or failing to comply with any provision of this Chapter shall be guilty of a violation thereof; and where any neglect, refusal, or failure is continued, after notice from the Public Works Department, every day's continuance thereafter shall constitute a separate and distinct offense for which the Utility shall be liable.