(a) Pre-construction inspection. Prior to the issuance of any land disturbance permit, the city must inspect all tree protection devices for compliance with approved plans. Land disturbance permits will not be issued until tree protection fencing has been installed correctly. (b) Construction inspection. During construction, the city will periodically inspect all projects to assure the adequacy of tree protection fencing. Failure to adhere to the provisions of this chapter will constitute noncompliance. (c) Final inspection. Prior to the release of the project for final platting or certificate of occupancy, or other form of acceptance, the city shall inspect for compliance with all requirements. In the event required landscaping has not been installed, the developer may provide a performance security subject to the requirements of section 25C-10-62. (d) Maintenance inspection. Two (2) years after the installation of required landscaping, the city shall conduct a maintenance inspection. Trees preserved to meet the required tree density standard which are dead or near death at the time of the maintenance inspection must be replaced if there is evidence that the demise of such trees was due to construction injury. Any trees planted to meet the required site density factor which are dead or near death must be replaced. Trees required to be replaced by this inspection must be planted within thirty (30) days of receipt of notification by the current owner(s).