(a) Any owner of land within the city desiring to subdivide land shall submit to the city a final plat of the subdivision which shall conform to the minimum requirements set forth in this chapter and other ordinances of said city. No plat of a subdivision lying within the city, or any part thereof, shall be filed or recorded in the records of the clerk of the superior court and no subdivider may proceed with improvements or sale of lots in a subdivision until such subdivision and improvements have been approved by the director and such approval is entered in writing on the final plat of said subdivision. Moreover, no such plat shall be so recorded until the developer shall have submitted accurate "as built" drawings of all public improvements to be dedicated to the city, including easements, which drawings shall be certified by a registered surveyor licensed by the state. The city may refuse city utilities, refuse to accept rights-of-way, and refuse to issue construction permits to any person failing to comply with this section. Any person, firm or corporation initiating work in violation of this chapter shall be subject to the penalties as set forth in section 1-1-5 of this Code. The city shall not accept any alley, road, roadway, street, avenue, or thoroughfare built, improved, hard-surfaced or paved in violation of the thoroughfare design standards in article IV of this chapter. The city shall not accept any easement or right-of-way that does not comply with the conditions, requirements or stipulations set by the city in reviewing the proposed plans for subdivision. The subdivider, following the approval of the preliminary subdivision plan and all proposed improvements, shall file with the department of community development an application, applicable fees, and copies of the final subdivision plat in conformance with the checklist for such, as provided by the department of community development. (b) Prior to acceptance of public ways and infrastructure proposed to be dedicated to the city within the subdivision (to include roadways, water, sewer, storm sewer, lift stations, curb, gutter, sidewalks and public use areas) the developer shall provide to the city a written warranty as to said improvements in a form acceptable to the city. Said warranty shall require developer to repair or replace as necessary defective public way or infrastructure for a minimum of two (2) years from the date said improvements are accepted by city, plus an additional one (1) year warranty for each additional planned phase of the approved subdivision.