Sec. 25C-15-16. Submitting, minimum improvements.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) The final plat shall be submitted to the department of community development in triplicate, and unless this is done within one (1) year of the tentative approval of the preliminary plat, such tentative approval shall lapse.
(b) The sale of lots shall be contingent upon at least a minimum of public improvements being within the dedicated streets of the subdivision as follows:
(1) Streets. All streets shall be completed as per the approved plans and the applicable thoroughfare design standards. The person contracting with the subdivider to install the above-named improvements must be competent, qualified and licensed, and must submit a performance and payment bond countersigned by a city insurance agent to execute the type of work to be performed.
(2) Utility lines. All subdivisions shall have all gas, water, sewer, electric lines, telecommunications lines and cable TV lines installed underground, and these improvements shall be of types, sizes and constructed of materials and to specifications set forth by the DRP. All taps or cut-ins to water, gas or sewer mains shall be installed before any paving is laid. All taps or cut-ins to water, gas and sewer mains shall be installed to service each lot, parcel, tract or building site shown on the final plat of a subdivision, unless otherwise authorized in writing by the director of utilities. The person contracting with the subdivider to install the above-named utility improvements must be competent, qualified and licensed, and must submit a performance and payment bond countersigned by a city insurance agent to execute the type of work to be performed. The design for utilities to be installed shall be approved by the director of utilities. All locations for underground installations shall be staked throughout the entire project, and locations of underground utilities shall be approved by the director of utilities and/or the director of public services or their designated agent(s) prior to any excavation or trenching activities. Locations and modifications of excavation or trenching for the utility locations may be authorized in the field but shall be followed up with appropriate modification to "as-built" drawings. Such authorization may only be given by the director of public services and/or the director of utilities. No sewer, gas, water piping, electric conduit, telecommunications lines, conduit or cable TV conduit or lines shall be covered or concealed until tested, inspected and approved by the director of utilities. When an applicant has complied with the requirements of this section and a certificate is issued by the director of utilities and director of public services testifying that the payments for utilities have been made, the DRP shall consider approval of the final plat.
History
(Ord. No. 21-10, § 1, 6-22-21)