Skip to content
Georgia Commons
Menu

LaGrange · Zoning Ordinance

Title 25C - DEVELOPMENT AND PERMITTING / Chapter 25C-5 - BUILDINGS AND BUILDING REGULATIONS / Article VI - ELECTRICAL CODE / Division 3 - PERMITS; INSPECTIONS

Sec. 25C-5-101. Permit—Required.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

No person shall install or repair any electrical appliance or wiring, except repairs not involving the removing or alteration of present installations, until a permit has been secured from the electrical inspector; however, permits must be obtained whenever any electrically operated air conditioner is installed at any location in the city and this shall apply whether such air conditioner is replacing an old air conditioner or is a new installation of an air-conditioning unit or system. Not less than four (4) hours before any electrical work is started, except as noted in this section, a permit must be secured from the electrical inspector for such work to be done.

History

The history line the source prints at the end of the section.

(Ord. No. 21-10, § 1, 6-22-21)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lagrange/zoning/25c-5-101@2026-11-14-14f6ffe70e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

LaGrange Zoning Ordinance, Sec. 25C-5-101. Permit—Required | Georgia Commons