LaGrange · Zoning Ordinance
Title 25C - DEVELOPMENT AND PERMITTING / Chapter 25C-5 - BUILDINGS AND BUILDING REGULATIONS / Article VI - ELECTRICAL CODE / Division 3 - PERMITS; INSPECTIONS
Sec. 25C-5-101. Permit—Required.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
No person shall install or repair any electrical appliance or wiring, except repairs not involving the removing or alteration of present installations, until a permit has been secured from the electrical inspector; however, permits must be obtained whenever any electrically operated air conditioner is installed at any location in the city and this shall apply whether such air conditioner is replacing an old air conditioner or is a new installation of an air-conditioning unit or system. Not less than four (4) hours before any electrical work is started, except as noted in this section, a permit must be secured from the electrical inspector for such work to be done.
History
(Ord. No. 21-10, § 1, 6-22-21)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.