A conditional use permit may be issued to erect, repair, construct, relocate or maintain a telecommunications tower within the city, provided that: (1) The tower is not greater than 150 feet in height; provided, however, that the mayor and council may allow a greater height if the applicant demonstrates that the purposes and goals as expressed herein are further met. (2) The tower maintains a galvanized steel finish or, subject to any applicable standards of the FAA, is painted a neutral color so as to reduce visual obtrusiveness. (3) No advertising is permitted on the tower or telecommunications facility. (4) The tower is not artificially lighted unless required by the FAA or other authority for safety purposes. Where required, the building inspector shall review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views. (5) The tower and telecommunications facility uses materials, colors, textures, screening, and landscaping that will blend the tower and base facility to the natural setting and built environment. (6) The tower and telecommunications facility meets or exceeds current standards and regulations of the FAA, the FCC or such governing agency with the authority to regulate telecommunications towers and antennas. If such standards and regulations are changed, then the owner of the tower or telecommunications facility shall bring such tower or facility into compliance with any revised standards and regulations within six months of the effective date of such standards and regulations, unless a more stringent compliance schedule is mandated by the controlling agency. Failure to comply with this provision shall be grounds for the city to require removal or re-permitting of the antenna at the owner's expense. (7) The applicant demonstrates to the reasonable satisfaction of the city that no existing telecommunications facility can accommodate the applicant's proposed antenna. (8) The following setbacks and separation requirements are met: a. All towers, including but not limited to lattice towers and guy towers, must be set back from any property line abutting a residential district, as measured from the base of the tower, a distance of 500 feet. For a guyed structure, such setback shall be adequate to provide a vegetative, topographic, or other buffer sufficient to obscure view to the anchor from such adjoining properties; b. All towers and telecommunications facilities must have a front yard setback of 150 feet, and sufficient rear and side yard setbacks to fully contain the structure in the event of tower failure. (9) The tower and telecommunications facility is equipped with an anti-climbing device to prevent unauthorized access. (10) The tower complies with all current safety, design, structural, and wind loading standards of applicable building and technical codes adopted by the city, so as not to endanger the health and safety of residents. (11) The tower and telecommunications facility are designed to structurally accommodate the maximum number of additional users technically practical. (12) The following landscape buffer/screening requirements are met: a. Any tower or telecommunications facility which abuts a residentially zoned property shall have a minimum 50-foot landscaped, horizontal buffer that effectively screens the view of the tower and base facility from adjacent property. The buffer must include a solid opaque fence or solid vegetative buffer sufficient to screen the tower and base facility completely to a height of six feet from adjacent properties and rights-of-way. When topography and existing conditions allow, the required 50-foot horizontal buffer should be an undisturbed buffer; provided, however, the buffer may be crossed by an access drive of not greater than 12 feet in width; b. Any tower or telecommunications facility which abuts property zoned other than residential shall have a minimum 15-foot landscaped, horizontal buffer that effectively screens the view of the tower or base facility from adjacent property. The buffer must include a solid opaque fence or solid vegetative buffer sufficient to screen the tower and base facility completely to a height of six feet from adjacent properties and rights-ofway; c. Existing mature tree growth and natural land forms on the site shall be preserved to the maximum extent possible. Where towers or facilities are sited on wooded lots in excess of five acres, natural growth around the property perimeter may be a sufficient buffer; d. In locations where the visual impact of the tower or facility would be minimal, such as developed heavy industrial areas, the landscaping requirement may be reduced or waived. (13) The equipment at the tower or telecommunications facility is automated to the greatest extent possible to reduce traffic and congestion. (14) All access roads to the tower or telecommunications facility shall be constructed of dustless and durable Portland cement, concrete or asphaltic concrete complying with specifications established by the building inspector and maintained in a usable condition. (15) Principal, accessory and joint uses are as follows: a. Accessory structures used in direct support of a tower shall be allowed but not used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a tower facility shall not be stored or parked on the site of the tower, unless repairs to the tower are being made. b. Towers may be located on sites containing another principal use in the same buildable area. As long as all of the other siting, setback, separation, and general requirements of this article are met, towers may occupy a leased parcel on a site meeting the minimum lot size requirements for the zoning district in which it is located. When joint use of a lot is permitted, the city shall require the execution of a unity of title if two or more lots are utilized for setback purposes or to prohibit the unlawful division of a lot containing a tower and another principal use. The minimum distance between a tower and other principal use located on the same lot shall be the lesser of 100 percent breakpoint of the tower or 150 feet. This separation is required to assure compatibility of land uses and to provide for the health, safety, and welfare of individuals and structures occupying the same site. c. Joint use of a site is prohibited when a proposed or existing principal use includes the storage, distribution or sale of volatile, flammable, explosive or hazardous materials such as propane, gasoline, natural gas and dangerous chemicals.