Skip to content
Georgia Commons
Menu

Lamar County · Zoning Ordinance

Appendix 1 - ZONING / Article 4 - GENERAL PROCEDURES

Sec. 403. Continuance of non-conforming uses.

About this text

  • As published by Municode, current through 2024-12-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Invariably, at the time a land use and development control ordinance is adopted or amended, certain uses which lawfully existed prior to the

adoption or amendment will not conform to the regulations and standards for the districts in which they are located. These are known as non-conforming uses, and in order to feasibly adopt the ordinance and so as not to cause undue economic hardship on owners of non-conforming uses, these uses are allowed to continue under special conditions as outlined in the following parts of this section:

(a) Where a non-conforming use of a building or lot has ceased for more than six (6) months or has changed to a permitted or

conforming use, further use of the building or lot must be in conformance with the standards and requirements for the

district in which it is located.

(b) A non-conforming use must not be extended, altered or expanded, either on the same or adjoining property, unless the extension, alteration or expansion is in conformance with the requirements of the ordinance. However, any alteration that reduces the degree of the nonconformance, while not increasing the size of the nonconformance, may be authorized by the administrative officer.

(c) A non-conforming use which is altered or extended must meet applicable Lamar County building codes and development regulations. When an applicant seeks a building permit for the extension or alteration of a non-conforming use, the administrative officer will inspect the

unit and determine what (if anything) is needed to bring the unit into conformance with applicable building codes and development regulations. Upon determining that the proposed unit meets applicable building codes and development regulations, he/she will issue the building permit for the non-conforming

use.

(d) If a non-conforming building or structure suffers damage which does not exceed fifty (50) percent of its assessed valuation, the building or structure may be reconstructed and reused as before if

done within twelve (12) months from the time such damage occurred. If such damage is greater that fifty (50) percent of its assessed valuation, such a building or structure may only be reconstructed and used in conformity with the standards and requirements for the district in which it is located.

(e) A use which is non-conforming only with respect to screening or buffer requirements must provide required screens or buffers within a period of three (3) years

from the effective date of these regulations. This time period is to allow for the growth of natural vegetative buffers.

(Ord. No. 2009-06, § 1, 11-10-09; Ord. No.

2010-16, 11-16-10)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lamar-county/zoning/403@2024-12-17-7bff3efe38

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lamar County Zoning Ordinance, Sec. 403. Continuance of non-conforming uses | Georgia Commons