--- title: Lamar County Zoning Ordinance, Sec. 405. Certificate of occupancy required collection: local-codes id: local-code:lamar-county/zoning/405 cite_as: Lamar County, Ga., Zoning Ordinance ยง 405 canonical_url: https://georgiacommons.org/code/local/lamar-county/zoning/405 md_url: https://georgiacommons.org/code/local/lamar-county/zoning/405.md text_url: https://georgiacommons.org/code/local/lamar-county/zoning/405/text source_url: https://library.municode.com/ga/lamar_county/codes/code_of_ordinances date: 2024-12-17 status: active jurisdiction: county:lamar jurisdiction_name: Lamar County county_fips: "13171" corpus_version: local-codes-lamar-county-e7590ecbe6b6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lamar-county/zoning/~appendix-1/~article-4.md previous: https://georgiacommons.org/code/local/lamar-county/zoning/404.md next: https://georgiacommons.org/code/local/lamar-county/zoning/406.md index: https://georgiacommons.org/code/local/lamar-county.md branch: zoning edition: As published by Municode, current through 2024-12-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lamar-county/zoning/405@2024-12-17-2a8585d2d7 --- # Lamar County Zoning Ordinance, Sec. 405. Certificate of occupancy required > As published by Municode, current through 2024-12-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix 1 - ZONING / Article 4 - GENERAL PROCEDURES (a) A certificate of occupancy is required before a structure for which a building permit has been issued may be occupied or used. The building permit shows completion of the project when the administrative officer, or building inspector signs it in the appropriate space, certifying that to the best of his/her knowledge all requirements of these regulations have been met. The owner/ contractor will then receive the certificate of occupancy to be used as confirmation that he has complied with the provisions of these regulations. (b) The administrative officer will issue the certificate of occupancy within ten (10) days of receiving the building permit with required certifications, if he finds that all requirements of these regulations and all other applicable ordinances have been met, including the requirement for posting of house numbers. However, if he finds that all requirements of such ordinances have not yet been met when the owner/contractor seeks a certificate of occupancy, the administrative officer will not issue the certificate of occupancy. He will notify the owner/contractor within ten (10) days, stating reasons for the refusal. The owner/contractor will then need to confer with the administrative officer to determine what he needs to do in order to comply with these regulations and be eligible for a certificate of occupancy. ## History (Ord. No. 2010-16, 11-16-10; Ord. No. 2019-09, 6-18-19)