--- title: Lamar County Zoning Ordinance, Sec. 502.1. Improvement to existing roads and rights-of-way collection: local-codes id: local-code:lamar-county/zoning/502.1 cite_as: Lamar County, Ga., Zoning Ordinance § 502.1 canonical_url: https://georgiacommons.org/code/local/lamar-county/zoning/502.1 md_url: https://georgiacommons.org/code/local/lamar-county/zoning/502.1.md text_url: https://georgiacommons.org/code/local/lamar-county/zoning/502.1/text source_url: https://library.municode.com/ga/lamar_county/codes/code_of_ordinances date: 2024-12-17 status: active jurisdiction: county:lamar jurisdiction_name: Lamar County county_fips: "13171" corpus_version: local-codes-lamar-county-e7590ecbe6b6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lamar-county/zoning/~appendix-a/~article-5.md previous: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-a-article-5-502.md next: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-a-article-5-503.md index: https://georgiacommons.org/code/local/lamar-county.md branch: zoning edition: As published by Municode, current through 2024-12-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lamar-county/zoning/502.1@2024-12-17-bcb1ba9a70 --- # Lamar County Zoning Ordinance, Sec. 502.1. Improvement to existing roads and rights-of-way > As published by Municode, current through 2024-12-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - DEVELOPMENT REGULATIONS / Article 5 - REQUIRED DEVELOPMENT STANDARDS Every minor and major subdivision, every planned development, and every commercial or industrial/manufacturing use over one (1) acre shall have an entrance on a paved county public road. A. Existing unpaved public road: Any unpaved public road upon which a development has frontage and access shall be paved and widened according to the functional class of the public road (see section 502 Development standards for streets) along the frontage of the development to the nearest intersection with a paved county road. The minimum rightof-way required according to section 502 shall be dedicated along the entire frontage of the subdivision. The developer shall be responsible for all cost incurred in meeting the requirements of this section. The administrative officer may waive this requirement for developments that will have little to no impact on the existing unpaved road. B. Existing paved public road: Any existing paved county road upon which a development has frontage and access, and which is deficient relative to county specifications, shall be resurfaced and widened for the full length of the frontage of the subdivision as determined by the county's appointed engineer. The minimum rightof-way required according to section 502 shall be dedicated along the entire frontage of the subdivision. The developer shall be responsible for all costs incurred in meeting the requirements of this section. C. Right-of-way acquisition: In the event that the proposed development has frontage on a road with less than the required minimum right-of-way, the developer shall contact each property owner having road frontage along the county road where the paving is to be extended and determine whether or not they desire to participate in the paving of the road and obtain such right-of-way deeds as are required by the county. If the developer cannot acquire the required number of property owners to consent, the county will acquire the necessary right-of-way through any means necessary, including condemnation. The developer shall be required to pay to the county the estimated costs for acquisition including, but not limited to, appraisals, engineers, legal fees, expert witnesses, and any out-of-pocket expenses incurred. The county may, at any time during the development, require the payment of additional amounts if the county determines that there is insufficient money deposited to cover the costs of completion. At the conclusion of the project, the county will reimburse the developer any excess amounts it has deposited. Under no circumstances shall development of the proposed subdivision continue until all of the required funds have been tendered to the county. ## History (Ord. No. 2022-06, § 1, 8-16-22)