--- title: Lamar County Zoning Ordinance, Sec. 503 (Appendix A, Article 5). Development standards for lots collection: local-codes id: local-code:lamar-county/zoning/appendix-a-article-5-503 cite_as: Lamar County, Ga., Zoning Ordinance, Appendix A, Article 5, § 503 canonical_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-a-article-5-503 md_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-a-article-5-503.md text_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-a-article-5-503/text source_url: https://library.municode.com/ga/lamar_county/codes/code_of_ordinances date: 2024-12-17 status: active jurisdiction: county:lamar jurisdiction_name: Lamar County county_fips: "13171" corpus_version: local-codes-lamar-county-e7590ecbe6b6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lamar-county/zoning/~appendix-a/~article-5.md previous: https://georgiacommons.org/code/local/lamar-county/zoning/502.1.md next: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-a-article-5-504.md index: https://georgiacommons.org/code/local/lamar-county.md branch: zoning edition: As published by Municode, current through 2024-12-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lamar-county/zoning/appendix-a-article-5-503@2024-12-17-dc9d828c17 --- # Lamar County Zoning Ordinance, Sec. 503 (Appendix A, Article 5). Development standards for lots > As published by Municode, current through 2024-12-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - DEVELOPMENT REGULATIONS / Article 5 - REQUIRED DEVELOPMENT STANDARDS All lots established in Lamar County after the effective date of this ordinance must comply with the development standards contained in this paragraph. However, where provisions of the Lamar County Zoning Ordinance apply and are more strict, those provisions take precedence. Development standards for lots are as follows: A. Lot lines: As far as practical, side lot lines must be perpendicular or radial to street lines. B. Jurisdictional limits and lot lines: If a lot is divided by city or county boundary lines, the developer will follow the rules and regulations of the jurisdiction within which the majority of the lot lies. C. Lot frontage arrangements: Land must be subdivided in a manner that provides each lot in the subdivision with direct abutting access to an existing public street or to an approved street contained within the proposed development. Refer to the zoning ordinance for specifications on lot frontage widths for each zoning district. Major subdivisions approved after the date of this ordinance must have a minimum lot frontage width of two hundred (200) feet. Cul-de-sac lots may have a minimum lot frontage of fifty (50) feet with a building line width of two hundred (200) feet. D. Adequate building sites and setbacks: Each lot must contain an adequate building site not subject to flooding and outside the limits of existing easements or building setback lines required by this ordinance or any existing ordinance as is appropriate. Refer to the zoning ordinance for specifications on setbacks for each zoning district. Setbacks for lots in a major subdivision approved after the date of this ordinance must have a minimum front setback of one hundred (100) feet. E. Driveways: All lots within a subdivision/ development shall have a driveway for ingress and egress, of sufficient width, and paved with either asphalt or cement covering, and otherwise satisfying the requirements and specifications of this appendix. Driveways on county roads that require a culvert for proper drainage shall have a minimum width of thirty (30) feet. For major subdivisions, the paved area shall run the entire length of the driveway from its intersection with the road. For exempt subdivisions and minor subdivisions, or any other newly created driveway, the paving or cement covering must run at least twenty-five (25) feet from the intersection with the road. For commercial/industrial developments, the ingress/egress plans and parking area will be approved by the administrative officer and the road superintendent. The paving of the driveway must be completed prior to the issuance of a certificate of occupancy. F. Recessed (flag) lots: Where a recessed lot is allowed, it must satisfy all of the requirements found in section 202 of this ordinance. Any subdivision containing recessed lots that do not satisfy said requirements shall not be allowed. G. Double or reverse frontage lots: Double and reverse frontage, unless required by the building and zoning department, are prohibited except where essential to provide separation of residential development from traffic arteries or to overcome specific disadvantages of slope, orientation, or property size. A reserve strip planted with a vegetative screen across which there is no right of access may be required along the line of lots abutting such a traffic artery or other incompatible use. H. Lot remnants: Lot remnants are prohibited. Such remnant areas must be added to adjacent lots, rather than remain as unusable parcels. I. Monuments: Solid steel rods at least one-half (�) inch in diameter or square and two (2) feet long, must be set at all street corners, at all points where street lines intersect the exterior boundaries of the subdivision, at angle points in streets, at points of curve in streets, and at points of change of direction in the exterior boundaries of the subdivision. The top of the monument must have an indented cross to identify the finished grade. All other lot corners must be marked with solid steel rods no less than one-half (1 /2) inch in diameter, and at least two (2) feet long, driven so as to be flush with the finished grade. J. Lot size: Lot size requirements are found in the zoning ordinance for each zoning district. Major subdivisions approved after the date of this ordinance must have a minimum lot size of two (2) acres. ## History (Ord. No. 2022-06, § 1, 8-16-22)