A. Easements and widths: 1. Generally: All lots within a subdivision shall provide temporary and permanent easements for stormwater drainage and detention systems; for future sanitary sewer installations; for future water line installations; and for gas, electric, and telephone utilities and any other utilities. 2. Rear lot line easements: a. A permanent easement of not less than twenty (20) feet in width shall be reserved for the uses described in this section along the length of all rear lot lines. Said easements shall be shown on the final plat together with a short and plain statement that the easements shown are reserved for utility and drainage purposes. b. An additional easement of not less than twenty (20) feet in width adjacent to the permanent easement shall be reserved during the period of construction or as is reasonably necessary for the proper installation, maintenance, and repair of the improvements. 3. Side lot line easements: a. A permanent easement of not less than ten (10) feet in width shall be reserved for the uses described in this section parallel to and along the length of all side lot lines. Said easements shall be shown on the final plat together with a short and plain statement that the easements shown are reserved to for utility and drainage purposes. b. An additional easement of not less than twenty (20) feet in width adjacent to the permanent easement shall be reserved during the period of construction or as is reasonably necessary for the proper installation, maintenance, and repair of the improvements. 4. Easements along streams and drainage ways: a. Where a subdivision is traversed by a watercourse, drainage way, channel, or stream, on each lot through which said watercourse, drainage way, channel, or stream traverses, there shall be provided an easement of undisturbed buffer, in addition to any other easement provided for in this section, of not less than twentyfive (25) feet measured from the outer most edge of the bank of the watercourse, drainage way, channel, or stream contained within the lot for which the easement is required. A wider easement may be required for large streams, drainage ways, and for future sanitary sewer installations as provided for in this section. b. In a subdivision lot in which a watercourse, drainage way, channel, or stream forms the rear or side lot line, the easement provided for in subsections 2. and 3. of this section shall be in addition to, and shall be measured from the termination of, the undisturbed buffer easement provided for in paragraph a. of this subsection. 5. Stormwater detention facility easements: All stormwater detention facilities shall be accessible from a public street by an easement of not less than twenty (20) feet in width, and there shall be an additional easement for each detention facility itself, including an area of not less than twenty (20) feet around the outside perimeter of the facility. B. Installation of utilities: After the road rightof-way is brought to finished grade and approved, and before any base is applied, all of the underground work within the street right-of-way — water mains, gas mains, etc. must be installed completely and approved throughout the length of the road and across the flat section. At the same time, all service connections (where applicable) must be stubbed out to each lot. 1. Utility placement specifications (curb and gutter): Utility placement along subdivision streets with curb and gutter shall meet the following location requirements: Sewer: If authority supplied sewer service is available at the time of the subdivision application, sanitary sewer line will be installed in the center of the street at a depth of six (6) feet. If authority supplied sewer service becomes available after the subdivision infrastructure has been completed, then the sanitary sewer line may be located in the easement area(s) defined in section 504.A at the depth of four (4) feet. Allowed on left and right side of street, but on the opposite side of waterlines. Waterlines: Locate four (4) feet from edge of pavement at the depth of four (4) feet. Allowed on left and right side of street, but on the opposite side of gas line. Water meter boxes: Locate at the road/ street right-of-way and property line boundary. Allowed on left or right side of street. Gas: Locate six (6) feet from edge of pavement at a depth of three (3) feet. Allowed on left side of street, only. Power: Locate ten (10) feet from edge of pavement at a minimum depth of thirty (30) inches. Allowed on left and right side of street. Telephone, cable for tv or internet: Locate two (2) feet from edge of pavement at a depth of two (2) feet. Allowed on left and right side of street. Note: The left and right sides of the street are determined at entrance. Placement of underground utilities across the proposed roadway shall be bored after acceptance of the subgrade and placement of the concrete curb and gutter. Should obstacles be encountered during the boring process, the building and zoning department and Lamar County Road Department shall be notified prior to open cutting the roadway. Note: Where curb and gutter is installed, the location of utilities will be measured from back of curb. Where a sidewalk is installed, the location of utilities will be measured from the yard side of the sidewalk instead of the back of the curb or edge of pavement. C. Water supply systems: 1. Public water system: Water mains, fire hydrants, and stub connections to each lot within the development must be provided as shown on approved construction plans and must meet the requirements and specifications of the authority. a. This paragraph shall not be interpreted so as to require an individual owner who subsequently acquires a lot from the developer to subscribe to water service through the water authority. 2. Individual water supply: When a public water supply is not available through the authority as set forth above, and a community water system is not proposed by the developer, the developer must carefully consider the capability and suitability of the general area of the development to support individual water supplies. Such proposed water supplies must be approved by the Lamar County Health Department and the water authority. The building and zoning department must consider the recommendation of the Lamar County Health Department and the water authority regarding any proposed private water supplies in considering approval of a plat. D. Sanitary sewer disposal systems: 1. Public sewage system: Sewage mains, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans and must meet the requirements and specifications of the water authority. 2. Individual sewage system: When a public sewage system is not available through the water authority as set forth above, and a community sewage system is not proposed by the subdivider, the subdivider must carefully consider the capability and suitability of the general area of the subdivision to support individual sewage systems (septic tanks). Such proposed sewage system must be approved by the Lamar County Health Department and the water authority. The building and zoning department must consider the recommendation of the Lamar County Health Department and the water authority regarding any proposed private sewage systems in considering approval of a plat.