--- title: Lamar County Zoning Ordinance, Sec. 405 (Appendix F, Article IV). Certificate of final sign approval of finished sign required collection: local-codes id: local-code:lamar-county/zoning/appendix-f-article-iv-405 cite_as: Lamar County, Ga., Zoning Ordinance, Appendix F, Article IV, ยง 405 canonical_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-f-article-iv-405 md_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-f-article-iv-405.md text_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-f-article-iv-405/text source_url: https://library.municode.com/ga/lamar_county/codes/code_of_ordinances date: 2024-12-17 status: active jurisdiction: county:lamar jurisdiction_name: Lamar County county_fips: "13171" corpus_version: local-codes-lamar-county-e7590ecbe6b6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lamar-county/zoning/~appendix-f/~article-iv.md previous: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-f-article-iv-404.md next: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-f-article-iv-406.md index: https://georgiacommons.org/code/local/lamar-county.md branch: zoning edition: As published by Municode, current through 2024-12-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lamar-county/zoning/appendix-f-article-iv-405@2024-12-17-abd953b06a --- # Lamar County Zoning Ordinance, Sec. 405 (Appendix F, Article IV). Certificate of final sign approval of finished sign required > As published by Municode, current through 2024-12-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix F - SIGNS / Article IV - GENERAL PROCEDURES (a) A certificate of final sign approval is required before a sign for which a sign permit has been issued may be used or maintained. The sign permit becomes the certificate of final sign approval when the administrative officer or building inspector signs it in the appropriate space, certifying that to the best of his knowledge all requirements of these regulations have been met. The owner/contractor will then receive the certificate of final approval to be used as confirmation that he has complied with the provisions of these regulations. (b) The administrative officer will issue the certificate of final sign approval within ten (10) days of receiving notification from the applicant that construction of the sign has been completed, if he finds that all requirements of these regulations and all other applicable ordinances have been met. However, if he finds that all requirements of such ordinances have not yet been met when the owner/contractor seeks a certificate of final sign approval, the administrative officer will not issue the certificate of final sign approval. He will notify the owner/contractor within ten (10) days, stating reasons for the refusal. The owner/contractor will then need to confer with the administrative officer to determine what he needs to do in order to comply with the ordinance and be eligible for a certificate of final sign approval. After the sign is constructed and in place, the applicant must notify the administrative officer within two (2) working days that the sign is ready for final inspection. ## History (Ord. No. 2015-14, 12-15-15)