--- title: Lamar County Zoning Ordinance, Sec. 502 (Appendix K, Article 5). Criteria for approval collection: local-codes id: local-code:lamar-county/zoning/appendix-k-article-5-502 cite_as: Lamar County, Ga., Zoning Ordinance, Appendix K, Article 5, ยง 502 canonical_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-k-article-5-502 md_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-k-article-5-502.md text_url: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-k-article-5-502/text source_url: https://library.municode.com/ga/lamar_county/codes/code_of_ordinances date: 2024-12-17 status: active jurisdiction: county:lamar jurisdiction_name: Lamar County county_fips: "13171" corpus_version: local-codes-lamar-county-e7590ecbe6b6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lamar-county/zoning/~appendix-k/~article-5.md previous: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-k-article-5-501.md next: https://georgiacommons.org/code/local/lamar-county/zoning/appendix-k-article-5-503.md index: https://georgiacommons.org/code/local/lamar-county.md branch: zoning edition: As published by Municode, current through 2024-12-17 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lamar-county/zoning/appendix-k-article-5-502@2024-12-17-557fc691b6 --- # Lamar County Zoning Ordinance, Sec. 502 (Appendix K, Article 5). Criteria for approval > As published by Municode, current through 2024-12-17 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix K - ANTENNAS AND TOWERS / Article 5 - APPROVAL PROCESS AND REQUIRED STANDARDS (a) General. The following provisions govern the approval of towers and/or antennas as special exception uses other than those uses permitted in section 402: (1) In approving the tower and/or antenna special exception, the zoning appeals board must follow the criteria established for approval in this section. (2) In approving the tower and/or antenna special exception, the zoning appeals board may impose zoning conditions to the extent it concludes that conditions are necessary to buffer or otherwise minimize any adverse effect of the tower on adjoining properties. (3) Any engineering information submitted by the applicant shall be certified by a qualified professional engineer. (b) Site plan. Each applicant shall submit a scaled site plan, a scaled elevation view and other supporting drawings, calculations, and other documentation, signed and sealed by appropriate professional engineers, showing the location and dimensions of all improvements, including information concerning topography, radio frequency coverage, tower height requirements, setbacks, drives, parking, fencing, landscaping, adjacent uses and other information necessary to assess compliance with these regulations. (c) Factors considered by the zoning appeals board. The zoning appeals board shall consider the following factors in determining whether to recommend approval of the tower and/or antenna as a special exception use within the zoning districts of Lamar County, although it may waive or reduce the burden on the applicant of one (1) or more of these criteria, if the goals of these regulations are better served thereby: (1) Height of the proposed tower; (2) Proximity of the tower to residential structures and boundaries of residential districts; (3) Nature of uses on adjacent and nearby properties; (4) Surrounding topography; (5) Surrounding tree coverage and foliage; (6) Design of the tower, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; (7) Availability of suitable existing towers and other structures, as discussed in subsection 502(d) herein; (8) The public goal of rapid private sector development of advanced telecommunications and information technologies, as stated in the Telecommunications Act of 1996. (d) Availability of suitable existing towers or other structures. No new tower shall be permitted unless the applicant demonstrates to the reasonable satisfaction of the zoning appeals board that no existing tower or structure can accommodate the applicant's proposed antenna. Evidence submitted to demonstrate that no existing tower or structure can accommodate the applicant's antenna might consist of any of the following: (1) No existing towers or structures are located within the geographic area required to meet applicant's engineering requirements; or (2) Existing towers or structures are not of sufficient height, diameter or design to meet applicant's engineering requirements; or (3) Existing towers or structures do not have sufficient structural strength to support applicant's proposed antenna and related equipment; or (4) Applicant's proposed antenna would cause electromagnetic interference with the antenna(s) on the existing towers or structures, or an antenna on the existing tower or structures would cause interference with the applicant's proposed antenna; or (5) The fees or cost required to share an existing tower or structure or to adapt an existing tower or structure for sharing are unreasonable (Costs exceeding new tower development are presumed unreasonable.); or (6) Owners of existing towers or structures are unwilling to accommodate the applicant's needs within reason; or (7) Applicant demonstrates that there are other limiting factors that render existing towers and structures unsuitable. (e) Setbacks and separations. The following setbacks and separation requirements shall apply to all towers and antennas; provided that the zoning appeals board may reduce the standard setback and separation requirements if the goals of these regulations would be better served thereby. (1) Towers must be set back a distance equal to the height of the tower from any off-site occupied residential structure. (2) Towers, guy and accessory facilities must satisfy the minimum zoning district yard setback requirements. (3) In an AR zoning district, towers over ninety (90) feet in height shall not be located within one-quarter mile from any existing tower that is over ninety (90) feet in height. (f) Security fencing. Towers shall be enclosed by security fencing not less than six (6) feet in height and shall be equipped with an appropriate anti-climbing device; provided, that the zoning appeals board may waive such requirement if the goals of these regulations would be better served. (g) Landscaping. The following guidelines shall govern the landscaping surrounding towers, provided that the zoning appeals board may waive such requirements if the goals of these regulations would be better served. (1) Tower facilities shall be landscaped with a buffer of plants that effectively screens the view of the tower compound from adjacent residential property. For purposes of these regulations, the standard buffer shall consist of a landscaped strip at least four (4) feet wide outside the perimeter of the compound. (2) In locations where the visual impact of the tower would be minimal, the landscaping requirement may be reduced or waived. (3) Existing mature tree growth and natural landforms on the site shall be preserved to the maximum extent possible. In the event the tower is located on a large tract, the wooded lot and natural growth around the property perimeter may be a sufficient buffer. ## History (Ord. of 3-6-01)