Skip to content
Georgia Commons
Menu

Lamar County · Zoning Ordinance

Appendix A - DEVELOPMENT REGULATIONS / Article 1 - GENERAL

Article 1. GENERAL

About this text

  • As published by Municode, current through 2024-12-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

This document is entitled the Development Ordinance of Lamar County, Georgia. It may also be known by and cited by the short title of Lamar County Development Ordinance.

(Ord. No. 2022-06, § 1, 8-16-22) Sec. 102. Authority.

The power of a local government to enact an ordinance such as this, which is intended to protect the public health, safety, and welfare, is provided by the 1983 Constitution of the State of Georgia, article 9, section 2, paragraph 4.

Within the territorial limits of the county, no person shall divide or rearrange a lot line of any lot or parcel of land or grade, install streets, utilities, or make any improvements to a parcel(s) of land without complying with the provisions of this appendix. The Lamar County Board of Commissioners and the administrative officer acting within the scope of these regulations is the platting authority of Lamar County. No plat may be recorded in the office of the Clerk of Superior Court of Lamar County unless it follows the procedures as required in this appendix.

Developments that do not involve the division of land but are large in scope will also follow these procedures:

A. Subdivision plats: Any subdivider proposing to subdivide land within unincorporated Lamar County must

submit to the county plats of the proposed subdivision which conform to all regulations set forth in these regulations.

Application for approval of the plats must be made to the county under procedures

contained in this appendix.

B. Development plans: Any developer proposing planned developments, whether residential or mixed use, or any large

scale commercial, industrial, or manufacturing; any construction of a new road, whether proposed to be private or

public must make application to Lamar County under procedures contained in this appendix.

C. Utility placement: Any utility proposing to extend service on right-of-way

maintained by Lamar County must make application to Lamar County under procedures contained in this appendix.

(Ord. No. 2022-06, § 1, 8-16-22) Sec. 103. Jurisdiction.

This ordinance applies to all land within unincorporated Lamar County, Georgia.

(Ord. No. 2022-06, § 1, 8-16-22) Sec. 104. Purposes.

The Development Ordinance of Lamar County, Georgia, seeks to encourage the development of desirable land use patterns within Lamar County in accordance with the Lamar County Land Use Plan. The promotion of sound land use patterns is intended to reduce or eliminate the occurrence of certain conditions which can threaten the general health, safety, and welfare of the residents of Lamar County. This ordinance should serve the following purposes:

A. Encourage the development of economically sound and stable communities.

B. Assure the provisions of required streets, utilities, facilities, and services to new land development.

C. Assure the desired development is located on suitable land.

D. Assure the adequate protection of safe and convenient traffic access and circulations — both vehicular and pedestrian — in new land development.

E. Assure the provision of needed public open spaces and building sites in new

land developments through the dedication or reservation of land for recreational, educational, and other public purposes.

F. Assure in general the wise development of new areas in harmony with the Lamar

County Land Use Plan.

(Ord. No. 2022-06, § 1, 8-16-22) This ordinance provides for the following:

A. Defines certain terms used in this ordinance.

B. Establishes minimum standards for lots, streets, and other facilities associated with land development.

C. Provides procedures for administering and amending the ordinance.

D. Provides penalties for violation of this ordinance.

E. Repeals conflicting ordinances.

(Ord. No. 2022-06, § 1, 8-16-22) When used in this ordinance, the following words and phrases have the meaning as defined in this article. Terms not defined here have the same meaning as is found in most dictionaries, where consistent with the context. The terms must, will, and shall are mandatory in nature, indicating that an action has to be done. The term may is permissive and allows discretion regarding an action. When consistent with the context, words used in the singular number include the plural, and those used in the plural number include the singular. Words used in the present tense include the future. The word developer includes a firm, corporation, copartnership, association, institution, or person.

The word lot includes the words plot and parcel.

The word building includes the word structure.

The words used or occupied as applied to any land or building include the words intended, arranged, or designed, to be used or occupied.

(Ord. No. 2022-06, § 1, 8-16-22) Sec. 202. General definitions.

Administrative officer: The person, officer, or official and his authorized representative, whom the board of commissioners has designated as its agent for the administration of this ordinance.

As-built plans: Detailed construction plans showing completed improvements as constructed.

Block: A piece or parcel of land entirely surrounded by public roads or streets, other than alleys.

Board of commissioners: The board of commissioners of Lamar County, Georgia.

Buffer: That portion of a lot established for open space purposes and intended to separate properties with different and possible incompatible types of uses. A buffer must not be otherwise occupied with structures. A buffer must be at least twenty-five (25) feet wide and provide reasonable visual screening of the property through the provision of one of the following:

1. Planted vegetative screen at least twentyfive (25) feet wide and ten (10) feet high.

2. Fence or wall at least six (6) feet high, which provides visual screening.

Building line: The line which represents the distance a building must be set back from the boundary line of a lot, measured at the foundation of the building.

Building setback line: A line parallel to a specified minimum distance from the front, side, or rear property lines beyond which no foundation wall or part of the structure of any building projects with the exception of roof overhang, steps, and the subsurface projection of footings.

Center line, street: That line surveyed and monumented by the governing authority as the centerline of the street, or if such a centerline has not been surveyed, it is the line running midway between the outside curbs or ditches of the street.

Construction plan: A plan based on the approved preliminary plat, which shows all street design and profiles, topographic information, utility construction plans, sediment and erosion control plans, and other information which may be required by the administrative officer. It is submitted to the administrative officer for approval.

Crosswalk: A right-of-way within a block dedicated to public use, intended primarily for pedestrian use, and designed to provide access to adjacent roads and lots.

County: Lamar County, Georgia.

Curb cut: The point at which vehicular access is provided to an adjoining street from a lot.

Design standards: The specifications to land owners or subdividers for the preparation of plats — both preliminary and final — indicating among other things the optimum, minimum, or maximum dimensions of such items as right-ofway, blocks, easements, and lots.

Developer: Any individual, firm, association, syndicate, co-partnership, corporation, trust, or other legal entity having sufficient proprietary interest in the land sought to be developed to commence and maintain proceedings to develop the same under this ordinance.

Easement: The right or privilege of using another's property for purposes such as constructing and maintaining sanitary sewers, water mains, electric lines, telephone lines, storm sewers, gas lines, bicycle paths, pedestrian ways, and other purposes.

Elevation, front: The view of a building or group of buildings as seen from directly in front of structure.

Engineer: A professional engineer licensed in the State of Georgia and registered through the state board of professional engineers who is competent in the field of civil design.

Flood boundary: The area threatened by periodic flooding as determined by data maps provided by the Federal Emergency Management Administration (FEMA), U.S. Department of Housing and Urban Development (HUD), U.S.

Soil Conservation Service, U.S. Army Corps of Engineers or hydrological studies utilizing generally accepted engineering practices. All lands within the limits of a one (1) percent annualchance flood.

Hearing: Any regular or specially called meeting of the building and zoning department, the planning commission, or the board of commissioners.

Landscape architect: A person licensed by the State of Georgia pursuant to O.C.G.A. § 43-23-1 et seq. to practice or teach landscape architecture.

Land use plan: Any part or element of the overall plan for development adopted by the board of commissioners, as amended.

Large scale commercial, industrial, or manufacturing: Any development of over five (5) acres of impervious surface for the purposes of commercial, industrial, or manufacturing uses.

Lot: A parcel of land occupied or capable of being occupied by one (1) or more buildings and customarily incidental accessory buildings or uses, including such open spaces as are required by this ordinance.

Lot, corner: A lot located at the intersection of two (2) or more streets.

Lot, double frontage: A lot, other than a corner lot, which has frontage on more than one (1) street.

Lot of record: A lot which is part of a subdivision, the plat of which has been recorded in the office of the clerk of superior court of Lamar County, Georgia; or a parcel of land described by metes and bounds, the plat or description of which has been recorded in said office. If a portion of a parcel has been conveyed at the time of the adoption of this ordinance, the remaining portion of the lot or parcel will be considered a lot of record.

Lot remnant: Any portion or portions of a lot not suitable for building upon because of size or topography and remaining after the transfer of other portions of the lot to adjoining lots.

Lot width: The distance between side lot lines measured at the front building line. If a corner lot, the distance between lot lines measured along the front building line which parallels or more nearly parallels the rear lot line.

Owner(s) of record: The owner(s) of property as specified on the deed of the lot of record.

Parks and playgrounds: Public or community land, open spaces, or recreation areas represented on a subdivision plat as dedicated, reserved, or intended to be reserved, for recreational purposes.

Pedestrian way: Crosswalk or other areas designed and marked specifically for pedestrian traffic.

Percentage of grade: Measured down the street center line, the distance vertically (up and down) from the horizontal in feet and tenths of a foot for each one hundred (100) feet of horizontal distance.

Planned development: A coordinated largescale or comprehensive group development, either residential or mixed use, designed and constructed according to a development plan.

Planning commission: The Lamar County Planning Commission.

Plat/plan: A map or plan representing a subdivided parcel of land or combination of lands, prepared for the purpose of installing and/or finalizing existing and proposed elements of a site to be developed; this would include preliminary and final plat/plans.

1. Preliminary plat/plans: A plan showing the detailed design and layout of a subdivision of land, prepared for the purpose of development, and which includes all

improvements and meets all requirements specified in this ordinance.

2. Final plat/plan: A plat of a subdivision unit, or phase of development, with legal descriptions of all lots, easements, open space and right-of-way sufficient to

reproduce the plat in the field, and which meets the requirements of the Georgia

Plat Act of 1978, as amended. The final plat is intended for legal recording in the official deed book records of Lamar County for lots, right-of-way, easements, and

restrictive covenants.

3. Dedicated plat: A plat required for the dedication to the county or other public utility or authority of right-of-way for streets, public easements, sewer or water easements and facilities, or other public improvement that is accompanied by a

deed of dedication.

Pre-application review: An initial and informal stage of subdivision review at which the developer may make known preliminary plat proposals and the building and zoning department may respond and/or advise the developer concerning the subdivision regulations.

Private drive: A non-public, privately owned access way.

Private street: Any street within a planned development which meets appropriate public street design standards, but, for purposes of controlled access and privacy, is not dedicated to Lamar County and is not public.

Protective covenants: Contracts made between private parties, or conditions recorded with an approved plat and running with the title to the land, specifying the manner in which land may be used, developed, or improved with the intent of protecting and preserving the physical and economic integrity of a given area.

Public hearing: An official session of the planning commission or the board of commissioners, advertised according to law and called for purposes specified in the public notice.

Recessed (flag) lots: A parcel of land with a narrow strip providing access to a public road with the bulk of the property containing no frontage.

No minor or major subdivision shall contain any recessed lots unless the developer has applied for and received a variance from the board of commissioners as provided in section 410 and section 703 of this appendix.

Recessed lots, where allowed, shall meet the following requirements:

1. The access area of the lot must have frontage of at least fifty (50) feet on a public road, and it must maintain a

minimum width of fifty (50) feet the entire width of the access area from said road to its intersection with the main

body of the lot. A maximum of three (3) lots may be served by a single access area.

2. The main body of the lot standing alone must be a minimum of ten (10) acres. No

portion of the access area may be used in calculating the satisfaction of these

requirements.

3. No two (2) access areas can adjoin. No more than one (1) access area allowed

per three hundred (300) feet of road frontage. Access area must be at least three hundred (300) feet from any other driveway.

Reserve strip: A strip or parcel of land along, around, or between properties for the purpose of restricting access.

Review agency: Any so designated agency other than the planning commission or the board of commissioners which may review appropriate parts of plat submissions by reason of technical capability, authority, or interest.

Right-of-way: A strip of land designated, reserved, dedicated, or purchased for the purpose of pedestrian access, vehicular access, or utility line installation.

Road: A public or private right-of-way affording primary access by pedestrians and vehicles to and between properties and designated as a street, highway, thoroughfare, parkway, road, avenue, boulevard, or place.

1. Alley or service drive: A minor access way used for service access or property access under specified circumstances to the back or side of properties otherwise abutting a street.

2. Marginal access street: A residential street parallel and adjacent to a major street

which provides access to abutting properties with protection from through-traffic.

3. Cul-de-sac: A local street with only one

(1) outlet and having an appropriate terminal for the safe and convenient reversal of traffic movement.

4. Half street: A street or road adjacent to a subdivision tract boundary where only

half of the required right-of-way and road improvements are provided within the proposed subdivision and the responsibility for the other half is undecided or is left to the adjacent property owner. Where it is determined to be practical to require the dedication of the additional half when adjoining

property is subdivided, the other half of the street shall be platted to create a full width of right-of-way serving the adjoining tracts of land.

5. Road width: The shortest distance between lines of lots delineating the road right-of-way.

6. Local street/road: Street used primarily for access to the abutting properties and serves travel demands in the immediate

area, and designated as such in the street classification system map of the Lamar County Land Use Plan.

7. Collector street/road: Street which usually serves to either provide direct access to lots or distribute traffic from individual lots to major streets. It may also connect neighborhoods with one another. It should be designed to discourage excessive speeds and through-traffic. It is designated as such in the Street Classification System Map of the Lamar County Land Use

Plan.

8. Arterial street: Street used primarily to move traffic through the county. Connecting roads and access to adjacent property should be kept to a minimum on an

arterial street, as these interfere with traffic flow, adversely affecting the capacity and safety of the arterial street. It is designated as such in the Street Classification System Map of the Lamar County Land Use Plan (where one exists).

9. Tangent: A straight line that is perpendicular to the radius of a curve where the tangent meets the curve.

Sight distance, intersection: The distance measured from a vehicle's eye-height, measured from ground level to the eye-height of a motorist to a specific object to a specific distance based on the speed of oncoming vehicles.

Sight distance, stopping: The unobstructed vision of a motorist on a horizontal plane along a street centerline as measured from the motorist's eye-height.

Soil erosion and sediment control plan: A plan for temporary and permanent facilities to control soil erosion and sedimentation on a construction site. (See Lamar County Soil Erosion and Sedimentation Control Ordinance.)

Subdivider: Any individual, firm, association, syndicate, co-partnership, corporation, trust, or other legal entity having sufficient proprietary interest in the land sought to be subdivided to commence and maintain proceedings to subdivide the same under this ordinance.

Subdivision: Lamar County recognizes the division of land in three (3) categories: Exempt Subdivision, Minor Subdivision, and Major Subdivision.

Exempt subdivisions:

• All lots are five (5) acres or more and all lots are served by an existing public

road;

• Divisions of an existing parcel into four

(4) lots or less, which does not create a nonconforming lot for zoning purposes

and all lots are served by an existing public road;

• The combination or restructuring of portions of previously platted and approved lots in a major or minor subdivision

where the total number of lots does not increase and the size of the lots still meets the standards set forth within the approved subdivision; or

• The division of land among heirs by judicial decree.

Exempt subdivisions are handled administratively through the administrative officer and do not require public hearings or board approval. Exempt subdivisions require a final plat.

Minor subdivisions:

• Divisions of an existing parcel into five

(5) lots or more with each lot served by an existing public road, and may or may

not create nonconforming lots for zoning purposes; or

• The division of a parcel that is part of a previously approved and platted exempt,

minor, or major subdivision.

Minor subdivisions require final plat review and approval by the planning board and the board of commissioners. Minor subdivisions may require rezoning if nonconforming lots are proposed. Minor subdivision may also require land disturbing permits.

Major subdivisions:

• Any division of an existing parcel with access to any newly created lot dependent on the construction of a new road; or a

change in an existing road.

Major subdivisions require preliminary review and approval, construction plans, land disturbance permits, and final plat review and approval by the planning board and the board of commissioners. They also may require an approved map amendment to the Official Zoning Map of Lamar County.

Surveyor, land: One who is qualified to engage in the practice of land surveying and who possesses a current certificate of registration as a land surveyor issued by the state board of registration for professional engineers and land surveyors.

Water authority: The current governing body having authority over public water and sewer systems.

Water ordinance: The regulations enacted by the authority of the local water and sewer system.

Zoning: The delineation of districts and the establishment of regulations governing the use, placement, spacing, and size of land and buildings.

Zoning administrator: The person designated or appointed by the board of commissioners to oversee the duties and responsibilities of the building and zoning department.

Zoning district: The various zoning districts as defined in the county zoning ordinance.

Zoning map: The official geographically defined document that is part of the zoning ordinance and delineates the boundaries of zoning and overlay districts.

Zoning ordinance: The Lamar County Zoning Ordinance.

History

The history line the source prints at the end of the section.

(Ord. No. 2022-06, § 1, 8-16-22)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lamar-county/zoning/article-1@2024-12-17-42144c2bc1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lamar County Zoning Ordinance, Article 1. GENERAL | Georgia Commons