The following shall be shown on the plan: (1) The scale on all plan sheets and on all construction detail sheets (excluding plan and profile sheets as they are specified called out in subsection 38-127(d)) shall be sufficient to make details clear and legible for review and construction purposed [proposed]; (2) Water, sanitary sewer, storm sewer, power, telephone, and cable lines, poles, structures, etc.; (3) Lot lines with lot numbers, easements and roadway, if applicable; and (4) Details of locations where water, sewer and storm pipes lines conflict. Show elevations of pipes at these locations.