The following shall be shown on the plan: (1) A topographic survey of all lands in the watershed which drains into the property and all the property itself; (2) Drainage basins, flow calculation information such as acreage of basin, runoff coefficients, travel times, time of concentrations, etc., and directions of flow for each basin in the watershed; and (3) The scale on all plan sheets and on all construction detail sheets (excluding plan and profile sheets as they are specified called out in subsection 38-127(d)) shall be sufficient to make details clear and legible for review and construction purposed [proposed].