--- title: Lee County Zoning Ordinance, Sec. 38-154. Phased developments collection: local-codes id: local-code:lee-county/zoning/38-154 cite_as: Lee County, Ga., Zoning Ordinance § 38-154 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-154 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-154.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-154/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-iv/~division-1.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-153.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-155.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-154@2026-06-23-55df908902 --- # Lee County Zoning Ordinance, Sec. 38-154. Phased developments > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article IV - DESIGN CONSIDERATION IN LAND DEVELOPMENT PLANNING AND LAYOUT / Division 1 - GENERALLY (a) Joint consideration of the factors of both emergency access and capacity shall follow layouts for access to phased developments as follows: (1) Provide at least two separate roadways fully connected to the internal system of roadways; or (2) Provide a divided-type entrance roadway with a median of sufficient width to largely ensure freedom of continued emergency access by lanes on one side. The required median width shall range from 12 to 30 feet as required by the site in question. (b) Phased developments are allowed to have one phase that does not meet the requirements of subsection (a) of this section, but the next phase shall bring the previous phase into compliance. Only one phase at a time is allowed not to be in compliance with this section. (c) Future streets to be extended or started and being shown on the current plan proposed are to be constructed to the ends of all proposed lots. An example is where a new street is to be built in a later phase between two lots. This street is to be built to the rear property line of the two lots during the phase which create those lots. ## History (Ord. of 9-18-00(2), § 38-154)