(a) Where a subdivision is traversed by a watercourse, drainageway, natural channel or stream that conveys stormwater from other adjoining county rights-of-way or easements, there shall be provided a right-of-way conforming substantially to the limits of such watercourse plus additional width as necessary to accommodate future construction and/or maintenance as determined by the manager of development services. (b) Any manmade drainage systems, excluding planned community lakes unless they are a designed part of the storm drainage system, shall provide rights-of-way or easements conforming substantially to the limits of the system plus additional width as necessary to accommodate maintenance as determined by the manager of development services. (c) No buildable lot shall be subdivided for development with a stormwater detention/ retention easement contained within the bounds of the property. (d) All stormwater detention/retention areas shall be conveyed to the board of commissioners in fee simple title. (e) Any drainage systems deeded to the county shall have access rights-of-way conveyed with it to provide legal ingress and egress for county personnel to carry out maintenance duties. Such access shall be a minimum of 20 feet in width. (f) For areas on lots where fill material is placed to eliminate the ponding of stormwater, the displaced stormwater shall be directed to a designated right-of-way or easement and the design storm calculations shall allow for the increase in projected storm runoff. (g) All stormwater drainage systems conveying stormwater directly from a road right-ofway to a retention/detention pond shall convey the stormwater through a closed system consisting of acceptable pipe sized to handle the calculated volume of stormwater.