Sec. 38-205. Interruption of service.

About this text

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Flow of storm drains maintained. Adequate provisions shall be made for the flow of drains and watercourses encountered during construction, and the structures that may have been disturbed shall be satisfactorily restored upon completion of the work.

(b) Interruption of water or sewer service. No valve or other control on the existing system shall be operated for any purpose by the permit holder without approval of the utilities authority. All consumers affected by such operation and the utilities authority shall be notified at least six hours before the operation and advised of the probable time the service will be restored.

(c) Utilities and service connection. All existing utilities and service connections shall be protected, maintained and kept in service during construction operations. Any existing utilities cut or damaged shall be repaired immediately and the service restored on the existing lines.

History

The history line the source prints at the end of the section.

(Ord. of 9-18-00(2), § 38-205)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lee-county/zoning/38-205@2026-06-23-6020a201e8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lee County Zoning Ordinance, Sec. 38-205. Interruption of service | Georgia Commons