Skip to content
Georgia Commons
Menu

Lee County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article V - GENERAL CONSTRUCTION; WORK CONDITIONS / Division 2 - GENERAL CONSTRUCTION STANDARDS AND SPECIFICATIONS

Sec. 38-215. Route clearing.

About this text

  • As published by Municode, current through 2026-06-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The extent of route clearing required is that minimum degree of clearing necessary to install utilities and appurtenances, and such additional clearing as shown on the drawings.

(a) Clearing.

(1) Remove above grade structures only where specifically authorized.

(2) Remove abandoned underground facilities such as utilities and structures, walls, footings, basements, wells, septic tanks, tanks, underground pipe, and other items which conflict with construction.

(b) Holes and depressions.

(1) Fill holes, depressions and voids created or exposed by clearing operations with non-organic soil material, unless further excavation earth work is indicated.

(2) Place fill material in horizontal layers not exceeding six inches loose depth and thoroughly compact to a density at least equal to adjacent ground.

(c) Disposal of waste material.

(1) Dispose of all material in accordance with all local, state and federal laws, rules and regulations.

(2) Burning of cleared materials on the work site is only permitted when authorized by the Forestry Service.

History

The history line the source prints at the end of the section.

(Ord. of 9-18-2000(2), § 38-215)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:lee-county/zoning/38-215@2026-06-23-5e74fe91e8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Lee County Zoning Ordinance, Sec. 38-215. Route clearing | Georgia Commons