(a) Residential subdivision lots shall be laid out so as to provide positive drainage away from all buildings, and individual lot drainage shall be coordinated with the general storm drainage pattern. The grade shall be sloped away from the structure for a slope of not less than six inches within a distance of ten feet. (b) Drainage shall be designed so as to avoid concentration of storm drainage water from each lot to adjacent lots. (c) New dwelling structures (along with all appurtenances to include all garages and mechanical equipment) located in lot recorded as part of a subdivision shall meet any of the following criteria for determining the dwelling structure finished floor elevation (F.F.E.): (1) As part of the design process far subdivisions, the engineer or surveyor preparing the construction plans shall designate on the plans any lots which require no additional requirements as to grading and/or finished floor elevations. For all other lots, the plans shall clearly describe what special requirements are necessary to build on the lots with grading requirements (i.e., establish a minimum F.F.E., elevate the structure above the roadway elevation or other known feature a specified amount, or elevate the structure as required by the floodplain management ordinance in flood hazard zones A and AE). These requirements shall also be noted on the final plat recorded for the development. A permanent benchmark shall be established for the development and shown on the final plat. (2) An engineer or surveyor lensed in the Sate of Georgia shall review available topographic information to determine whether the lot is located within or adjacent to a closed contour based upon local topography. If the lot is within or adjacent to the confines of a closed contour the engineer or surveyor shall certify that the building site for the dwelling is two feet above the spillover elevation (where present) or at least two feet above the 100-year high water level. The proposed structure shall have a finished floor elevation at least three feet above the calculated 100-year high water elevation. The 100-year high water elevation shall include pre and post-developed runoff coming to the site and shall include any stormwater retention or detention area whether manmade or natural. (3) For lots recorded prior to the date of this requirement, the builder shall obtain the services of a professional engineer or registered land surveyor to visit the site and/or review original subdivision construction plans to determine if special grading and/or finished floor elevations are appropriate for the proposed structure. If the engineer/ surveyor finds that no special requirements are necessary, he shall write a letter to Lee County stating that there are no special requirements for the subject lot. If the engineer/surveyor finds that special considerations are warranted, he shall write a fetter to Lee County clearly describing what special requirements are necessary to build on the subject parcel (i.e., establish a minimum F.F.E., elevate the structure above the roadway elevation or other known feature a specified amount, or elevate the structure as required by the floodplain management ordinance in flood hazard zones A and AE). (4) As an alternative to hiring an engineer or surveyor to perform the services described in subsection (3) above, the builder may elevate the dwelling structure and appurtenances so that all finished floors elevated to at least 24 inches above the centerline of the road at the lowest point along the lot frontage. Earthen fill shall be placed around the foundation of all dwelling structures so that the elevation of the finished grade immediately adjacent to the foundation of the structure shall be at least 12 inches above the road centerline at the lowest point along the lot frontage. The grade shall be sloped away from the structure for a slope of not less than six inches within a distance of ten feet. (d) Permit process. (1) Prior to issuing a residential building permit, Lee County shall review the recorded subdivision plat to determine if there are special grading considerations for the subject lot. (2) If the final plat or other criteria requires a minimum finished floor elevation for the subject lot, the builder shall obtain the services of a registered surveyor licensed in Georgia to set a grade stake on site at the required minimum finished floor elevation for use in constructing the structure foundation. (3) Following completion of construction but prior to occupancy, the builder shall again obtain the services of a registered surveyor to confirm that the structure was properly elevated. The surveyor shall write a letter to the county noting the required minimum finished floor elevation and the actual constructed finished floor elevation.