--- title: Lee County Zoning Ordinance, Sec. 38-298. Modifications for off-site facilities collection: local-codes id: local-code:lee-county/zoning/38-298 cite_as: Lee County, Ga., Zoning Ordinance ยง 38-298 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-298 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-298.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-298/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-vii/~division-2.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-297.md next: https://georgiacommons.org/code/local/lee-county/zoning/division-3.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-298@2026-06-23-c0bf5db721 --- # Lee County Zoning Ordinance, Sec. 38-298. Modifications for off-site facilities > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article VII - STORM DRAINAGE SYSTEMS / Division 2 - PERMIT PROCEDURES AND REQUIREMENTS The stormwater management plans for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. A stormwater management plan must be submitted to the development services department which shows the adequacy of the off-site or regional facility if the offsite facility is available and if all provision have been made to use the capacity of the facility. To be eligible for a modification, the applicant must demonstrate to the satisfaction of the development services director or his designee that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas: (1) Increased threat of flood damage to public health, life, and property; (2) Deterioration of existing culverts, bridges, dams, and other structures; (3) Accelerated streambank or streambed erosion or siltation; (4) Degradation of in-stream biological functions or habitat; or (5) Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations. ## History (Res. No. LD05-A049, 9-23-2005)