--- title: Lee County Zoning Ordinance, Sec. 38-299.1. Runoff reduction collection: local-codes id: local-code:lee-county/zoning/38-299.1 cite_as: Lee County, Ga., Zoning Ordinance ยง 38-299.1 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-299.1 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-299.1.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-299.1/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-vii/~division-3.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-299.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-300.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-299.1@2026-06-23-73f8664d7d --- # Lee County Zoning Ordinance, Sec. 38-299.1. Runoff reduction > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article VII - STORM DRAINAGE SYSTEMS / Division 3 - POST DEVELOPMENT STORMWATER MANAGEMENT (a) All projects, unless exempt according to the criteria below, that meet one or more of the following criteria shall provide runoff reduction volume as outlined below: (1) Increases the peak rate of runoff from the site by more than one cubic foot per second for a ten-year frequency storm; (2) Involves the creation of 5,000 square feet or more of impervious cover, or that involves other land development activities of one acre or more; (3) Redevelopment (excluding routine maintenance and exterior remodeling) that creates, add, or replaces 5,000 square feet or greater of new impervious surfaces or that involves land disturbing activity of one acre or more; (4) Any new development or redevelopment, regardless of size, that meet the definition of a stormwater hotspot; (5) New and redevelopment if land development activities that are part of a subdivision or other common plan of development and the sum of all associated impervious surface area or land disturbing activities that are being developed as of such development meets or exceeds the thresholds in subsections (1) and (2) above; or (6) Linear transportation projects that exceed the threshold in subsections (1) or (2) above. (b) Exempt projects may include land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs, disturbance for trench utility work, disturbance for implementing or repairing stormwater management or environmental restoration by local, state, or federal authorities, and installations or modifications to existing structures solely to implement Americans with Disabilities Act ("ADA") requirements. (c) The runoff volume generated by the first one inch of rainfall shall be retained on-site using runoff reduction methods, to the maximum extent possible. A stormwater management system is presumed to comply with this criterion if: (1) It includes green infrastructure practices that provide for the interception and evapotranspiration, infiltration, or capture and reuse of runoff, that have been selected, designed, constructed and maintained in accordance with the Georgia Stormwater Management Manual; or constitutes an alternative practice responsibly designed and documented by a professional engineer to reproduce the intent of the Georgia Stormwater Management Manual; and (2) It is designed to provide the amount of runoff reduction from the runoff generated by the first one inch of rainfall as specified in the latest edition of the Georgia Stormwater Management Manual. (3) The applicant shall prioritize stormwater management measures used to meet the runoff reduction standard in the following order: a. Vegetated infiltration BMPs: bioretention, stormwater planters, enhanced swales, stormwater wetlands, etc. b. Infiltration practices installed underground, specifically dry wells, modified French drains, and similar practices. c. Permeable pavements. d. Green roofs, rainwater harvesting and reuse, and lined bioretention or lined stormwater planters. (4) If it is infeasible to apply the stormwater runoff reduction standard on part or all of the project site, documentation shall be included with the site plan review documents. Documentation can include, but is not limited to: geotechnical reports, site constraints, or historical constraints. (5) If the runoff reduction standard listed above can be met using runoff reduction methods, then section 38-300 (water quality) is satisfied and no further water quality treatment is required. (6) If the runoff reduction standard listed above cannot be met, then the 1.2-inch rainfall event must be treated per section 38-300 (water quality). ## History (Ord. of 3-14-2023)