--- title: Lee County Zoning Ordinance, Sec. 38-307. Structural stormwater controls collection: local-codes id: local-code:lee-county/zoning/38-307 cite_as: Lee County, Ga., Zoning Ordinance ยง 38-307 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-307 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-307.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-307/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-vii/~division-3.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-306.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-308.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-307@2026-06-23-2473026f4d --- # Lee County Zoning Ordinance, Sec. 38-307. Structural stormwater controls > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article VII - STORM DRAINAGE SYSTEMS / Division 3 - POST DEVELOPMENT STORMWATER MANAGEMENT All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the development services director or his designee before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the development services director or his designee may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question. Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. ## History (Res. No. LD05-A049, 9-23-2005)