Lee County · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article VII - STORM DRAINAGE SYSTEMS / Division 4 - CONSTRUCTION INSPECTIONS OF POST-DEVELOPMENT STORMWATER MANAGEMENT SYSTEM
Sec. 38-311. Inspections to ensure plan compliance during construction.
About this text
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Periodic inspections of the stormwater management system construction shall be conducted by the development services director or his designee or conducted and certified by a professional engineer who has been approved by the development services director or his designee. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.
All inspections shall be documented with written reports submitted to the development services director's office and shall contain, at a minimum, the following information:
(1) The date and location of the inspection;
(2) Whether construction is in compliance with the approved stormwater management plan;
(3) Variations from the approved construction specifications; and,
(4) Any other variations or violations of the conditions of the approved stormwater management plan.
If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. Such corrective action shall be taken by the party responsible therefore within a reasonable time as required by the development services director.
History
(Res. No. LD05-A049, 9-23-2005)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.