Lee County · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article VIII - DESIGN ELEMENTS FOR ROADS AND RIGHTS-OF-WAY / Division 1 - GENERALLY
Sec. 38-317. Street design.
About this text
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Pavement width.
(1) Pavement widths in this section do not include curb and gutter dimensions. Tables 5.3 and 5.4 contain the standard minimum pavement widths.
(b) Minimum clear sight distance shall be calculated for wet pavement conditions at the various design speeds and using the K factors for the various types of streets. These sight distances shall be provided on both horizontal and vertical curves. For horizontal curves, the sight distance shall be checked by direct scale from the midpoint of the curb lane. The minimum vertical curve length required shall be calculated by multiplying the algebraic difference in grade times the K factor found in Tables 5.3, 5.4, and 5.5 for residential, nonresidential and collectors respectively. Vertical curves shall be designed into the roadway layout when meeting grades that are in excess of two percent.
(c) Cul-de-sac specifications.
(1) Where allowed. Cul-de-sac streets shall be allowed only under the classification of a local street.
(2) Length shall be measured from the edge of the pavement of the outside lane of the intersecting street to the outside edge of the pavement on the turnaround radius as listed in Tables 5.3 and 5.4 for residential and nonresidential streets respectively.
(3) No more than six lots shall front on the turn around of a cul-de-sac. This includes any combination of traditional and flag style lots.
(4) The minimum radii of a round turnaround for residential and nonresidential cul-desac streets are listed in Tables 5.3 and 5.4 respectively.
(5) Standard street pavement shall be required in turnarounds.
(6) A single road serving a high-density development such as a apartments or condominiums will usually exceed the average daily trips for local roads. Such road shall not be granted to the county and shall be considered as part of the internal access to that development.
(d) Road to be extended because of phased development.
(1) A gravel turnaround is allowed if the road is expected to be extended in less than two years and has less than the maximum number of average daily trips (ADTs) loading for the type of street (residential or nonresidential). Such a turnaround shall not be allowed on any street classified as a minor street or higher. A monetary guarantee shall be required as described in subsection (2) below.
(2) A monetary guarantee is required for any kind of non-paved turnaround for the specified time limit plus one month. This guarantee is to ensure that a paved turnaround is installed or the roadway is continued. This monetary guarantee is to be for 110 percent of the cost of constructing a paved turnaround to the existing standards and shall meet all requirements of an improvements guarantee as specified elsewhere in this chapter.
(3) T or hammerhead turnarounds are allowed for roadways that are expected to be extended within five years of final construction of the present phase. Such a turnaround shall not be allowed on any street classified as a major street or higher.
(e) Right-of-way widths.
(1) New or proposed streets. Tables 5.3 and 5.4 list right-of-way widths for new streets.
(2) Existing streets with no or partial county deeded rights-of-way shall have right-of-way widths determined on the following criteria; volume of traffic, road type classification, pavement type, drainage problems . . . etc.
(f) Structural roadway design. The specifications for construction of roads within the unincorporated areas of the county shall include the latest edition of the Georgia Department of Transportation Standard Specifications for Roads and Bridges, with all appendices.
(1) Pavement design period to be 20 years.
(2) Minimum average daily traffic for design purposes shall be:
a. Residential streets plus four percent annual growth rate.
1. Local, 300 ADT with minimum 0.5 percent truck volume.
2. Minor, 1,150 ADT with minimum 0.5 percent truck volume.
3. Major, 1,600 ADT with minimum 0.5 percent truck volume.
b. Nonresidential streets plus four percent annual growth rate.
1. Local, minor, and major are determined by traffic counts with a minimum one percent truck volume.
c. Collector plus six percent annual growth rate.
1. Minor and major, determined by traffic counts with a minimum 1.5 percent truck volume.
(3) Minimum asphaltic concrete thickness is to be not less than 11 /2 inch after compaction.
(4) Minimum Portland cement concrete thickness is to be not less than four inches after compaction.
(5) The applicant shall provide an engineering study certified by a state licensed engineer showing the proposed design to be in compliance with this section. The engineering study shall include a pavement structural detail based on the AASHTO, Guide for Design Pavement Structures, or other design method and specifications for the materials and construction of the proposed design approved by the manager of development services.
(6) All materials and construction methods used in construction of roadway pavement shall conform to the standards of the Georgia Department of Transportation.
History
(Ord of 9-18-00(2), § 38-317)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.