--- title: Lee County Zoning Ordinance, Sec. 38-447. General requirements collection: local-codes id: local-code:lee-county/zoning/38-447 cite_as: Lee County, Ga., Zoning Ordinance § 38-447 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-447 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-447.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-447/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-x/~division-1.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-446.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-448.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-447@2026-06-23-98b39d705d --- # Lee County Zoning Ordinance, Sec. 38-447. General requirements > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article X - POTABLE WATER REQUIREMENTS / Division 1 - GENERALLY The state public health regulations and the utilities authority control the installation of potable water facilities. The following are additional minimum requirements: (1) When future extensions are possible, water easements through the proposed development shall be required. (2) Drinking water wells shall be approved by the applicable state health agency when such systems are permitted by the utilities authority. (3) Any project shall be designed so as to conform to the utilities authority's master plan for water development. Where in the opinion of the utilities authority it is deemed necessary in order to implement the master plan to provide additional capacity in the design of the distribution or collection facilities for future needs of the utilities authority, the cost of additions shall be borne by the utilities authority. (4) All public water systems shall be placed in such a way so as to have access to public rights-of-way or easements. Public water systems shall meet the minimum standards set forth in chapter 70 or any other applicable local, state or federal law, rule or regulation. (5) A ten-foot-wide buffer screen made of plants described in chapter 70 is required around all property containing public water pumping, treatment and storage systems and all property containing public sewage treatment systems for all properties located within or adjacent to residential developments. (6) Access to any properties containing public water production or sewage treatment systems must have an access easement, a driveway connection and a suitable surface to drive upon. ## History (Ord. of 9-18-00(2), § 38-447)