--- title: Lee County Zoning Ordinance, Sec. 38-452. Construction constraints collection: local-codes id: local-code:lee-county/zoning/38-452 cite_as: Lee County, Ga., Zoning Ordinance § 38-452 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-452 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-452.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-452/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-x/~division-1.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-451.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-453-to-38-458.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-452@2026-06-23-56d47774c2 --- # Lee County Zoning Ordinance, Sec. 38-452. Construction constraints > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article X - POTABLE WATER REQUIREMENTS / Division 1 - GENERALLY (a) Quality assurance. (1) Qualification of workmen. Provide at least one person who shall be present at all times during the construction who is thoroughly familiar with the work involved and who shall direct the work. (2) Codes and standards. Conform to all federal, state and local laws and regulations. (3) Qualifications of testing agency. Where the services of a testing agency are required, use only qualified testing laboratories with not less than three years experience in conducting and evaluating the required tests. (b) Submittals. Submit laboratory reports to the manager of development services for all tests performed on this project as required by this section or by applicable federal, state or local agencies. (c) Prevention of contaminated water at lines in service. Sections of water lines adjacent to existing water lines that are in service shall be chlorinated, flushed and checked for absence of bacteria before the new section of the line can be pressure tested. A pressure test may be performed on the line before chlorinating, provided the new line is not connected to any existing line during the pressure test. This procedure is set forth to prevent contaminated water or water with high chlorine content from being forced into a line in service through a faulty valve or other defect during pressure tests. ## History (Ord. of 9-18-00(2), § 38-452)