--- title: Lee County Zoning Ordinance, Sec. 38-461. Construction collection: local-codes id: local-code:lee-county/zoning/38-461 cite_as: Lee County, Ga., Zoning Ordinance § 38-461 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-461 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-461.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-461/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-x/~division-2.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-460.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-462.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-461@2026-06-23-76c0292d81 --- # Lee County Zoning Ordinance, Sec. 38-461. Construction > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article X - POTABLE WATER REQUIREMENTS / Division 2 - POTABLE WATER SPECIFICATIONS (a) Setting valves, valve boxes, fittings and blow-offs. (1) General. Gate valves, butterfly valves and pipe fittings shall be set and jointed to new pipe in the manner heretofore specified for cleaning, laying and jointing pipe. (2) Valve boxes. Cast iron valve boxes shall be firmly supported, and maintained centered and plumb over the wrench nut of the valve, with box cover flush with the surface of the finished pavement or at other such level as may be directed by the manager of development services. In other than paved areas, after setting the valve box, construct a protective concrete collar around the cover at ground level and slope away from the box cover. Concrete collar shall be a minimum of four inches thick by 18 inches square. (3) Back siphoning to be prevented. Drainage branches of blow-offs shall not be connected to any sewer or submerged in any stream or be installed in any other manner that will permit back siphoning into the distribution system. (b) Setting fire hydrants. (1) Wherever hydrants are set in impervious soil, a drainage pit two feet in diameter and two feet deep shall be excavated below each hydrant and filled completely with coarse gravel or broken stone mixed with coarse sand, under and around the bowl of the hydrant and to a level six inches above the waste opening. No hydrant drainage pit shall be connected to a sewer. (2) The bowl of each hydrant shall be well braced against the unexcavated earth at the end of the trench with stone slabs or concrete backing. Both hydrant and valve shall be tied to the pipe with mechanical joint retainer glands. Concrete backing shall be installed in such a manner as to leave pipe and fitting accessible for repair. In no case shall the waste opening be obstructed from free drainage. (3) Hydrants shall be thoroughly cleaned of dirt or foreign matter before setting. (c) Plugging dead-ends. Standard plugs shall be inserted into the bells of all dead pipes, tees or crosses and spigot ends shall be capped. Plugs or caps shall be jointed to the pipe or fittings in the appropriate manner. (d) Special construction. For construction on piers, supporting pipe on bridges, or other special work, use safe and generally accepted construction methods to accomplish the required work. ## History (Ord. of 9-18-00(2), § 38-461)