(a) Sanitary sewer stub-outs shall be provided for each development lot and shall extend from the sewer line to the property line if public sanitary sewer service is provided in the development. (b) No sanitary sewer shall be allowed to connect to any storm drainage pipes or systems. (c) Sanitary sewer velocities shall be sufficient to prevent deposition, yet not high enough to cause separation or cause erosive damage to the pipe. In order to accomplish this sewers shall be sloped to achieve a minimum velocity of two feet per second when the conduit is flowing half full. The slope shall also be designed so that the velocity will not exceed ten feet per second. The required slope to achieve minimum velocity (n = 0.13) shall be: Pipe size (inches) Slope (foot/100 feet) 8 0.40 10 0.28 12 0.22 15 0.15 18 0.12 21 0.10 24 0.08 27 0.07 30 0.06 (d) Infiltration into the sewer shall not exceed 200 gallons per minute per mile of sewer per inch of inside diameter of pipe per 24 hours in any section between successive manholes. In areas where the seasonal or normal groundwater is above the top of the pipe, the plans are to be noted as such and special conditions may be placed on those pipes.