--- title: Lee County Zoning Ordinance, Sec. 38-490. Sewer system design criteria collection: local-codes id: local-code:lee-county/zoning/38-490 cite_as: Lee County, Ga., Zoning Ordinance § 38-490 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-490 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-490.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-490/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-xi/~division-2.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-486-to-38-489.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-491.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-490@2026-06-23-9e2230a6f0 --- # Lee County Zoning Ordinance, Sec. 38-490. Sewer system design criteria > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article XI - SANITARY SEWAGE REQUIREMENTS / Division 2 - SANITARY SEWER STANDARDS AND SPECIFICATIONS (a) Minimum design criteria. (1) When sewer mains cross water mains a minimum vertical separation of 18 inches shall be provided between the outsides of the pipes. (2) At sewer main and water line crossings, one full length of sewer pipe (20 feet) must be centered directly under the water line. (3) For crossing of new construction of sewer mains and water lines, the water lines shall be on top of the sewer mains. (4) Sewer mains must be laid at least ten feet horizontally from any existing or proposed water line. Where it is not practical to maintain the ten-foot separation, the water main must be laid in a separate trench and that the bottom of the water line be at least 18 inches above the top of the sewer line. (5) Only ductile iron is to be used within 20 feet of the bank of any stream. (6) Mains, service lines, structures, etc., shall not be located on or in close proximity to an existing or abandoned landfill site of any other site used for waste disposal. (b) Locations. (1) Sewer mains when located in the right-of-way or adjacent utility easement will be located on the opposite side of the road when water lines are present. ## History (Ord. of 9-18-00(2), § 38-490)