--- title: Lee County Zoning Ordinance, Sec. 38-492. Construction collection: local-codes id: local-code:lee-county/zoning/38-492 cite_as: Lee County, Ga., Zoning Ordinance § 38-492 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-492 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-492.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-492/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-xi/~division-2.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-491.md next: https://georgiacommons.org/code/local/lee-county/zoning/70-99-to-70-125.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-492@2026-06-23-2746ee6b86 --- # Lee County Zoning Ordinance, Sec. 38-492. Construction > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article XI - SANITARY SEWAGE REQUIREMENTS / Division 2 - SANITARY SEWER STANDARDS AND SPECIFICATIONS (a) Manhole construction specifications. (1) Use whatever care, materials and construction technique are required to achieve permanent watertight joints and connections. (2) Every manhole is to be fully and completely built as the work progresses, as each is reached by the laid pipe, and shall be carried up to its top finish grade. Manholes and any attachments to them shall be neatly and accurately built, of proper materials and in a workmanlike manner. Brick shall be hard-burned, common brick meeting ASTM specifications C-32-58, grade NA or concrete brick meeting ASTM C-55-55, grade A. The minimum compressive strength for concrete used shall be 3,000 psi at 28 days. Field specimens for laboratory tests shall be made in accordance with ASTM standards. (3) Manhole bottoms shall be either cast-in-place or integral with the lower section of the riser walls. Cast-in-place bottoms shall be a minimum of eight inches thick and shall be not less than 12 inches in diameter larger than the bottom outside diameter of the riser section. The invert of the manhole shall be built up with cement grout so to facilitate the entrance and flow of sewage through the manhole. Manhole bottoms shall have shaped inverts and channels completed neatly so as to permit smooth hydraulic flow of sewage through the manhole. The shaping may be constructed with cement grout or an approved alternate. (4) When required, single lengths of pipe shall be built into manholes to receive either present or future branch lines. To relieve pressures in brick manholes, the brick is to be arched over all such pipe. Where there is no intent to construct the branch lines at once, the pipe inserted must be securely closed in a manner that the future connection can be made without breaking the pipe. (5) Where the manhole intercepts existing laterals, the lateral service to the existing manhole shall be kept intact until the new section of sewer line is completed and approved. Then the laterals shall be broken and fed to the new manhole and the dead-end at the manhole wall shall be plugged and grouted. (6) Precast concrete units. a. Set precast units plumb and to exact grade on approximately three inches thickness of compacted sand bedding. b. In the event field conditions necessitate additional pipe connections for which no holes have been cast, neatly chip necessary holes, being careful not to crack portions of unit to remain. Replace any units excessively damaged as a result of field modification as determined by the manager of development services or his designee. c. Fill joints between sections with butyl based sealant especially formulated for sewer service or an approved equal. Supplement connecting joints with manufactured water stops or seals when recommended by pipe manufacturer or necessary to minimize leakage. d. Precast concrete units shall have structure bottom integral with the lower section of the riser walls. e. Joints in riser and cone sections shall have rubber gaskets or an approved equal. (7) Masonry structures. a. Examine masonry units prior to installation and reject all units which are cracked, damaged, or in any way fail to meet this specification. b. Use only clean masonry units, free of dirt and debris which would adversely affect mortar bond. Do not use frozen materials, or materials mixed or coated with ice or frost. c. Set masonry units in full mortar bed, carefully fitting units around pipe openings... etc., so as to fill all voids; completely fill any remaining voids with mortar. Do not use mortar that has been mixed more than 45 minutes or which has been retempered. d. When using multi-wythe construction, make every fifth coarse a header coarse. e. Do not install masonry when the air temperature is below 40 degrees Fahrenheit and falling. f. Do not backfill against masonry structures until they are at least seven days old. In cold weather delay backfilling for a longer time to allow additional curing time for mortar. g. Saturate outside wall of each manhole with water, and plaster with a smooth, one-half-inch thick minimum coat of mortar, except that the mortar shall be mixed with one part cement to two parts sand. Do not add hydrated lime to plaster mortar. h. Brick shall be hard-burned common brick meeting ASTM specifications C-32-58, grade NA or concrete brick meeting ASTM C-55-55, Grade A. i. Minimum compressive strength for concrete and concrete brick shall be 3,000 psi at 28 days. Field specimens for laboratory tests shall be made in accordance with ASTM standards. j. Masonry structures shall have cast-in-place bottoms and they shall be a minimum of eight inches thick and shall not be less than 12 inches in diameter larger than the bottom, outside diameter of the riser section. k. To relieve pressures caused by single lengths of pipe built into brick, the brick shall be arched over all such pipe. (8) Metal castings. a. All castings shall be made of clean, even grain, tough gray cast iron being smooth and free from projections, sand, holes or defects. b. The quality of iron shall conform to the current ASTM A-48, class 30, gray iron casting specifications. c. The raised letter "Sanitary Sewer" shall be cast on the upper surface of all manhole covers. d. The portion of the frame and cover which forms the cover seat shall be machined so that no rocking of the cover is possible. e. The castings shall be coated with a coal tar, pitch varnish. f. Examine each casting before installation and reject all castings which are cracked, damaged or in any other way fail to meet the specifications. g. Clean castings of dirt, mud and grease before installation. h. Set castings according to location and arrangement shown on the drawings. Rigidly support castings to maintain true alignment and elevation. Where castings are located in concrete or mortar construction, thoroughly work concrete or mortar around the casting so as to eliminate voids and provide solid bearing surfaces and rigid construction. i. Make frames, subject to traffic, firm and stable under actual traffic conditions. When constructed in paved areas set frames to conform with exact pavement surface including tilting frame where necessary to match pavement surface. (b) Installing sanitary sewer in tunnel liner or pipe encasement. (1) Tunnel liner, six to 42 inches. Insert sewer pipe concentrically into tunnel liner by securing hardwood blocks radially around sewer pipe at no more than ten-foot, longitudinal intervals. Use stainless steel banding for securing wood blocks in place. Blow sand into annular space between sewer pipe and tunnel liner starting at the longitudinal center and proceeding outward to each end. Use techniques which assure complete filling of all voids. (2) Tunnel liner, 42 inches and larger. Use the following procedure for installing sewer pipe in tunnel when adequate working room is available, otherwise follow same procedures as specified for tunnel liners that are between six and 42 inches. Insert sewer pipe into tunnel liner after having grouted bottom of tunnel to exact grade required to support pipe in proper position. Permanently secure sewer pipe in position by blocking each pipe length at top and sides with brick and mortar, followed by bedding sewer pipe to a depth equal to one-fourth the pipe outside diameter, with concrete. Plug ends of tunnel with 12-inch thickness of masonry, leaving weep holes at lower end of tunnel. (3) Pipe encasement. The encasement used shall be bituminous coated, welded steel pipe of wall thickness and size shown on the drawings or an approved equal. Pipe shall conform to ASTM A-252, Grade 2. Encasement shall conform to AASHTO standards and state department of transportation standards where placed under highways and to AREA 1-A-13 where placed under railroads. (c) Wyes, tees and service. (1) Provide wyes and/or service tees at points indicated on drawings, specified herein, and as requested by the manager of development services. If wyes or service extensions are not to be connected to a building sewer under this work, close end of pipe with removable, factory fabricated plug or stopper. (2) When replacing and existing sewer, connect all existing service lines to the new sewer. (3) Service lines, unless otherwise shown on the drawings or requested by the county, are to be run to suit field conditions at a minimum grade of two percent and with a minimum pipe cover of 30 inches. (4) Provide clean-outs in service lines at not more than 75-foot intervals and where pipe horizontal deflection exceeds 45 degrees. Unless noted otherwise, furnish clean-outs consisting of wye and 45-degree fittings, vertical pipe and threaded brass or PVC removable plug. (d) Force mains. (1) Force mains shall be of ductile iron pipe and shall be constructed only so far in advance of pipe laying as the manager of development services shall permit. Force mains shall have at least 30 inches of cover. The trench widths shall be at least one foot greater than the pipe diameter and the maximum clear trench width shall not be more than two feet greater than the pipe diameter. (2) Placement procedures of the pipe shall meet the same requirements as water lines. Testing and limits of acceptability of the pipeline shall be the same as for water lines. (3) Submit certification for the manager of development services that the soil along the route of the proposed pipeline has been analyzed and evaluated in accordance with AWWA C105 and that the soil will not be corrosive to ductile iron pipe. Where polyethylene sheath is placed on pipe, the trench shall be backfilled to a depth of not less than one foot above the top of the pipe with sand or sand-clay backfill. Sand or sand-clay backfill shall be specially selected from the excavation and shall contain no stumps, roots, rocks, or other items that will puncture sheathing. ## History (Ord. of 9-18-00(2), § 38-492)