(a) Utility work permit. (1) Information and plans for a utility work permit shall be limited to small drawings depicting location, scope, limits of work and time schedule for completion. (2) Plans do not require an engineer's seal and signature. (b) Potable water and sanitary sewer. (1) Plans approved by the utilities authority; (2) Erosion and sedimentation control plan; (3) Stormwater management plan, if the project is more than main line construction; and (4) Any specifics required for design stated elsewhere in this chapter.