--- title: Lee County Zoning Ordinance, Sec. 38-96. Permit work inspections collection: local-codes id: local-code:lee-county/zoning/38-96 cite_as: Lee County, Ga., Zoning Ordinance § 38-96 canonical_url: https://georgiacommons.org/code/local/lee-county/zoning/38-96 md_url: https://georgiacommons.org/code/local/lee-county/zoning/38-96.md text_url: https://georgiacommons.org/code/local/lee-county/zoning/38-96/text source_url: https://library.municode.com/ga/lee_county/codes/code_of_ordinances date: 2026-06-23 status: active jurisdiction: county:lee jurisdiction_name: Lee County county_fips: "13177" corpus_version: local-codes-lee-county-30354395a313 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/lee-county/zoning/~part-ii/~chapter-38/~article-iii/~division-1.md previous: https://georgiacommons.org/code/local/lee-county/zoning/38-95.md next: https://georgiacommons.org/code/local/lee-county/zoning/38-97-to-38-120.md index: https://georgiacommons.org/code/local/lee-county.md branch: zoning edition: As published by Municode, current through 2026-06-23 edition_date_kind: current_through source_publisher: Municode version_id: local-code:lee-county/zoning/38-96@2026-06-23-d6f5c80c4a --- # Lee County Zoning Ordinance, Sec. 38-96. Permit work inspections > As published by Municode, current through 2026-06-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 38 - LAND DEVELOPMENT CODE / Article III - LAND DEVELOPMENT PERMITS / Division 1 - GENERALLY (a) The manager of development services or his designee will periodically inspect the sites for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. (b) The manager of development services or his designee shall have access to any permitted work for inspections at any time. When inspection for approval is required, the permit holder shall notify the manager of development services 48 hours in advance. After notification to the manager of development services and expiration of the 48-hour period the work, may proceed with or without inspection. The county reserves the right to require modifications or corrections if the work does not meet the requirements of this chapter. The following inspections are required: (1) Any specific items additionally noted at the time the permit is issued; (2) Potable water construction to include; a. Flushing; b. Waterline pressure testing; c. Chlorination; and d. Bacteriological water sampling. (3) Sanitary sewer construction; (4) Pavement base construction; (5) Any storm drainage construction underneath a proposed county road; and/or proposed easements. (6) Any construction in existing county rights-of-way or easements. (c) The permit holder shall be fully responsible for any construction work. The manager of development services may require any uninspected work required to be inspected to be uncovered for inspection at the sole expense of the applicant. The manager of development services or board of commissioners shall in no way be liable for any cost or damages arising from or in any way associated with any delay or inconvenience associated with any work, delay or inconvenience caused by uncovering uninspected work that is required by this chapter to be inspected. (d) A request by phone call or letter may schedule a visit to the site by the manager of development services or his designee. The permit holder is responsible for contacting the manager of development services or his designee 48 hours in advance for all required inspections. ## History (Ord. of 9-18-00(2), § 38-96)