Lee County · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 70 - ZONING / Article XXI - SOLAR ENERGY SYSTEMS
Sec. 70-698. Conditional use review.
About this text
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Upon receiving a conditional use application for an SES, the Lee County shall conduct permitting proceedings in accordance with the requirements of the Lee County zoning code (chapter 70, article III, section 70-89).
(b) Conditional uses shall be initially reviewed by the planning commission and a recommendation regarding approval or denial of such conditional use application shall be made to the Lee County Board of Commissioners based on criteria located in chapter 70, article III, section 70-89.
(c) With respect to the approval or denial of a conditional use application under this section, both the Lee County Planning Commission and the Lee County Board of Commissioners shall consider the following with respect to each conditional use application:
(1) Whether the proposed SES facility can coexist with healthy tree coverage within the area where the proposed SES facility is to be located;
(2) Whether the SES facility will negatively affect the ecological benefits of forestland with respect to the forestland's continuing ability to maintain their clean water filtration capacity, soil erosion control, clean air, wildlife habitat, aesthetics and recreation potential is substantial. With respect to such analysis, the following should be considered with respect to such potentially impacted forestland;
(3) Whether the proposed SES site will avoid clear cutting forests entirely; and
(4) If a solar energy system is proposed on forestland, the footprint or design (a) avoids the healthiest sections of forest and oldest trees, and (b) adopts habitat corridors to protect wildlife.
(5) Whether the proposed plan establishes that a policy of zero net loss should be followed, meaning both planting the same number of trees that were cut elsewhere.
(6) Whether the proposed SES facility shall be physically positioned in such a way that glare does not affect adjacent properties or roadways.
(7) Whether the proposed SES facility complies with required setbacks, visual buffers and signage requirements.
(8) Whether the proposed SES application provides long-term plans to minimize stormwater runoff and soil erosion impacts from the SES facility through the following site design practices:
(9) Whether the proposed SES application provides for the avoidance of soil compaction underneath and around panels during and after construction by using low impact construction techniques.
(10) Whether the proposed SES application provides for maintaining natural soil and vegetative groundcover in good condition underneath the panels, rather than cement, gravel or bare dirt. Such vegetative groundcover should include: (i) a meadow condition with native grasses are low growing, low maintenance, and have deeper roots which help decrease soil compaction; (ii) planting pollinator friendly habitat (native plant species, such as shrubs, grasses, and wildflowers) between, below, and alongside solar panels, thus, helping restore pollinator population through dual land uses.
(11) Whether the proposed SES application provides for avoiding chemical fertilizers, pesticides and fungicides, as this can pollute stormwater runoff and may require stormwater treatment, and requiring mowing of the grass areas.
(12) Whether the proposed site for the SES facility is suitable, taking into consideration impacts to soils, particularly as to prime farmland and farmland of statewide significance, the applicant's efforts to locate the proposed facility away from prime agricultural land, the sites accessibility to electric transmission infrastructure at the site and generally in the county, any special rationale offered by the applicant for location decisions that may be related to watershed management and aquifers, the applicant's proposed use of equipment (including types of equipment) and site preparation practices designed to minimize soil disturbances, and the applicant's proposals regarding maintaining compatible mixes of uses at the proposed facility site.
(13) Whether the proposed site for the SES facility contains prime farmland or farmland of statewide significance which would likely be negatively impacted by the construction and operation of such an SES facility;
(14) Whether the conversion of the proposed site for the construction and operation of an SES facility results in the removal of economic opportunities for agriculture-related businesses doing business in Lee County and surrounding counties;
(15) Whether the use of the proposed land for the construction and operation of the proposed SES facility is compatible with existing adjacent land uses;
(16) Whether the proposed solar facility will likely have an adverse or negative effect upon the fair market value of real property, including, but not limited to, residential, commercial, or agricultural real property, in the geographic area within a radius often ten miles of where the solar facility is to be located;
(17) A conditional use application may be denied if the Lee County Board of Commissioners determines the proposed SES facility does not meet the requirements of the Lee County zoning code, including, but not limited to, this article of the Lee County Code of Ordinances; provided, however, that a conditional use application which does not comply with one or more of the requirements of this section may be approved by the board of commissioners with or without the recommendation of the planning commission if the board of commissioners finds that the requirements of this section not complied with are not applicable to the particular application or that the failure to comply with particular requirements of this section can be excused due to special conditions existing with respect to the real property upon which the SES is proposed to be located.
In the event that the conditional use application is denied, then the applicant may file an appeal in the same manner and under the same terms and conditions as appeals in other zoning cases in Lee County are filed and prosecuted. In the event that the conditional use application is approved, the county shall issue the applicant a written permit for the construction and operation of the SES within ten calendar days of the approval of the conditional use application by the Lee County Board of Commissioners. The construction and operation of the SES facility by the owner shall be undertaken at all times in accord with the Lee County Code of Ordinances, including, but not limited to, this article.
History
(Ord. of 1-28-2020; Ord. of 10-26-2021, pt. 5)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.