Leesburg · Zoning Ordinance
Appendix C - LAND DEVELOPMENT REGULATIONS / Article X - POTABLE WATER REQUIREMENTS / Division 2 - POTABLE WATER SPECIFICATIONS
Sec. 10.09. Quality assurance.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Qualification of workmen. Provide at least one person who shall be present at all times during the construction who is thoroughly familiar with the work involved and who shall direct the work.
(b) Codes and standards. Conform to all federal, state and local laws and regulations.
(c) Qualifications of testing agency. Where the services of a testing agency are required, use only qualified testing laboratories with no less than three years' experience in conducting and evaluation the required tests [sic].
(d) Submittals. Submit laboratory reports to the manager of development services for all tests performed on this project as required by these specifications or by applicable federal, state or local agencies.
(e) Phasing of water line testing.
(1) Sections of water lines connected to existing water lines that are in service (even though valved off) shall be chlorinated, flushed and checked for absence of bacteria before the new section of line can be tested for hydrostatic compliance. This is set forth to prevent contaminated water or water with high chlorine content from being forced into a line in service through a faulty valve or other defect during pressure tests.
(2) Sections of water lines not physically connected to existing water lines, at the contractor's option, may test the line for hydrostatic pressure compliance before chlorinating.
(3) After water lines have passed the waterline purification test, the lines are tested for hydrostatic pressure compliance. Each valved section of water line is to be tested separately.
(4) The manager of development services shall be notified 48 hours prior to testing and allowed opportunity to witness hydrostatic testing and waterline purification.
(f) Water line purification.
(1) Before being placed into service. All new water distribution systems or extensions to existing systems, or any valved section of such extension or any replacement in the existing water distribution system shall be chlorinated. Any of the following methods of procedure shall be followed:
a. Liquid chlorine gas-water mixture;
b. Direct chlorine feed; and
c. Calcium hypochlorite and water mixture.
(2) Preliminary flushing. Prior to chlorinating, all dirt and foreign matter shall be removed by a thorough flushing through the hydrants, or by other approved means. Each valved section of newly laid pipe shall be flushed independently. On dead-end lines, temporary flushing outlets shall be provided and dead-end thoroughly flushed. Temporary outlets shall be removed and the end of the line plugged after flushing is complete. This shall be done after the pressure test is completed.
(3) Liquid chlorine. A chlorine gas-water mixture shall be applied by means of a solution fed chlorinating device, or if approved by the manager of development services, the gas shall be fed directly from a chlorine cylinder equipped with proper devices for regulating the rate of flow and the effective gas diffusion of gas within the pipe. Chlorinating with the gas-water mixture is preferred to the direct feed.
(4) Point of application. The preferable point of application of the chlorinating agent shall be at the beginning of the pipeline extension, or any valved section of it, and through a corporation stop inserted in the horizontal axis of the newly laid pipe. The water injector for delivering the gas-water mixture into the pipe shall be supplied from a tap on the pressure side of the gate valve controlling the flow into the pipeline extension. In a new system, application may be at the pumping station, or the elevated tank, or the standpipe or the reservoir if available.
(5) Rate of application. Water from the existing distribution system or other source of supply shall be controlled to flow very slowly into the newly laid pipeline during the application of chlorine. The rate of chlorine gas-water mixture flow shall be in such proportions to the rate of water entering the pipe that the chlorine dose applied to the water entering the newly laid pipe shall be at least 40 to 50 ppm.
(6) Back pressure prevented. Back pressure, causing a reversal of flow in the pipe being treated shall be prevented.
(7) Retention period. Treated water shall be retained in the pipe long enough to destroy all non-spore forming bacteria. The period shall be at least 24 hours and preferably longer as may be directed by the manager of development services. After the chlorine treated water has been retained for the required time, the chlorine residual at pipe extremities and at other representative points shall be at least 24 ppm. Water samples must be taken from suitable taps.
(8) Chlorinating valves and hydrants. In the process of chlorinating newly laid water pipe, all valves or other appurtenances shall be operated while the pipe is filled with the chlorinating agent.
(9) Final flushing and test. On dead-end lines, temporary flushing outlets shall be provided and the dead-end thoroughly flushed. Temporary outlets shall be removed and end of line plugged after flushing is complete.
(10) Repetition of procedure. Should the initial treatment prove ineffective, the chlorinating procedure shall be repeated until confirmed tests show that water sampled from the newly laid pipe conforms to the requirements of this ordinance.
(11) Calcium hypochlorite or chlorinated lime in water. On approval of the manager of development services, a mixture of either calcium hypochlorite or chlorinated lime of known chlorine content may be substituted as an alternative for liquid chlorine.
(12) Proportions of calcium hypochlorite or chlorinated lime and water mixture. A five percent solution shall be prepared consisting of five percent of either powder to 95 percent water by weight.
(13) Application. This calcium hypochlorite or chlorinated lime and water mixture, first made into a paste and them thinned to a slurry, shall be injected or pumped into newly laid pipe under conditions heretofore specified for liquid chlorine applications after preliminary flushing.
(14) Approval. Provisions for final flushing, testing and approval under this alternative shall be the same as those described previously.
(15) Procedure when cutting into existing pipelines. Cuts made in existing pipelines for the insertion of valves, fittings, repairs, or for any other purpose shall be chlorinated by shaking a predetermined quantity of the powder into the pipe on each side of the cut-in. After slowly filling the section and reversing the flow, the chlorinated water shall be retained for at least four hours, then flushed until no odor of chlorine can be detected in the flushing water, or until a check has been made for residual chlorine as provided for herein. If the contractor has any knowledge of foreign material entering the water line, or if the unfinished connection has been left unattended, or if the manager of development services requests, service shall not be restored until the absence of bacteria in the water has been demonstrated.
(16) Resumption of service. After satisfactory chlorinating by any of these alternative procedures, the consumer may be served from the newly laid pipeline or the service may be resumed on existing pipelines only after approval of the public health authority having jurisdiction and the city.
(g) Water quality tests of water mains.
(1) Following chlorinating, all treated water shall be thoroughly flushed from the newly laid pipe line at its extremities until the replacement water is throughout its length.
(2) After thoroughly flushing the new pipe, the water is required to be, upon testing, both chemically and bacteriologically proven equal to the water quality served the public and approved by the public health authority having jurisdiction and the manager of development services.
(3) Should the initial treatment as specified above prove ineffective, the water line purification procedure shall be repeated until confirmed tests show that water sampled from the newly laid pipe conforms to the requirements.
(4) Resumption of service. After satisfactory waterline purification by any of the procedures above, the consumer may be served from the newly laid pipeline or the service may be resumed on existing pipelines only after the approval of the public health authority having jurisdiction and the manager of development services.
(h) Hydrostatic tests of water mains.
(1) Pressure of test. Hydrostatic pressure to be used shall be 150 psi. (AWWA C500 Sec. 4.1 and 4.2)
(2) Duration of pressure test. Test shall last at least two hours.
(3) Procedure. Each section of pipe shall be slowly filled with water and the specified test pressure, measured at the lowest point of elevation, shall be applied by means of a pump connected to the pipe in a satisfactory manner. The pump, pipe connection, gauges and all necessary apparatus shall be furnished by the contractor.
(4) Expelling air.Before applying the specified test pressure all air shall be expelled from the pipe. To accomplish this, taps will be made, if necessary, at points of highest elevation and afterwards tightly plugged. Tapping clamps and saddles shall be used on PVC pipes.
(5) Permissible leakage. Suitable means will be provided by the contractor for determining the quantity of water lost by leakage under normal operating pressure. No pipe installation will be accepted if the leakage (evaluated on a pressure basis of 150 psi) is greater than that determined by the following formula:
L = SD(P).5/133,200
Where: L is the allowable leakage in gallons per hour;
S is the length of pipe tested, in feet;
D is the nominal diameter of the pipe, in inches; and P is the average test pressure during the leakage test, in pounds per square inch gauge.
(6) Variation from permissible leakage. Should any sections of pipe show leakage greater than the specified limit, the contractor shall locate and repair the defective part of the section until the leakage is within the specified allowance. When existing valves are used to isolate a section of line being tested, the contractor shall provide temporary caps or plugs to isolate the line being tested if the existing valve will not hold the required test pressure without leaking.
(7) Leakage defined. Leakage is the quantity of water to be supplied into the newly laid pipe, or any valved section on it, necessary to maintain the specified leakage test pressure after the pipe has been filled with water and the air expelled.
(8) Time for making test. Pipe may be subjected to hydrostatic pressure, inspected and tested for leaking at any convenient time after partial completion of backfill.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.